A platform for research: civil engineering, architecture and urbanism
HEAT COLLECTING SYSTEM
PROBLEM TO BE SOLVED: To suppress generation of waving and the like on heat collection pipes while suppressing increase of costs, and suppressing breakage of the heat collection pipes, in a heat collecting system in which the heat collection pipes are extended along an inner bottom portion of an existing pipe.SOLUTION: A heat collecting system 1 including a plurality of long heat collection pipes 10 extended in a pipe axial direction along an inner bottom portion 2a of an existing pipe 2, and exchanging heat between sewage water flowing in the existing pipe 2 and a heat exchange medium flowing in the heat collection pipes 10, further includes frames 30 having rigidity higher than the heat collection pipes 10, and capable of linearly constraining the heat collection pipes 10 in an exposed state. The plurality of heat collection pipes 10 are constrained by the plurality of frames 30 disposed while connected in the pipe axial direction along the inner bottom portion 2a of the existing pipe 2.
【課題】採熱管が既設管の内側底部に沿うように延設された採熱システムにおいて、コストの上昇を抑えつつ、採熱管に波打ち等が生じるのを抑え、且つ、採熱管の破損等を抑える。【解決手段】既設管2の内側底部2aに沿うように管軸方向に延設される複数の長尺の採熱管10を備え、既設管2内を流れる下水3と採熱管10内を流れる熱交換媒体とを熱交換させる採熱システム1である。採熱管10よりも高い剛性を有し、且つ、採熱管10を露出させた状態で直線状に拘束可能なフレーム30をさらに備えている。複数の採熱管10は、既設管2の内側底部2aに沿って管軸方向に連なるように設置された複数のフレーム30によって拘束されている。【選択図】図3
HEAT COLLECTING SYSTEM
PROBLEM TO BE SOLVED: To suppress generation of waving and the like on heat collection pipes while suppressing increase of costs, and suppressing breakage of the heat collection pipes, in a heat collecting system in which the heat collection pipes are extended along an inner bottom portion of an existing pipe.SOLUTION: A heat collecting system 1 including a plurality of long heat collection pipes 10 extended in a pipe axial direction along an inner bottom portion 2a of an existing pipe 2, and exchanging heat between sewage water flowing in the existing pipe 2 and a heat exchange medium flowing in the heat collection pipes 10, further includes frames 30 having rigidity higher than the heat collection pipes 10, and capable of linearly constraining the heat collection pipes 10 in an exposed state. The plurality of heat collection pipes 10 are constrained by the plurality of frames 30 disposed while connected in the pipe axial direction along the inner bottom portion 2a of the existing pipe 2.
【課題】採熱管が既設管の内側底部に沿うように延設された採熱システムにおいて、コストの上昇を抑えつつ、採熱管に波打ち等が生じるのを抑え、且つ、採熱管の破損等を抑える。【解決手段】既設管2の内側底部2aに沿うように管軸方向に延設される複数の長尺の採熱管10を備え、既設管2内を流れる下水3と採熱管10内を流れる熱交換媒体とを熱交換させる採熱システム1である。採熱管10よりも高い剛性を有し、且つ、採熱管10を露出させた状態で直線状に拘束可能なフレーム30をさらに備えている。複数の採熱管10は、既設管2の内側底部2aに沿って管軸方向に連なるように設置された複数のフレーム30によって拘束されている。【選択図】図3
HEAT COLLECTING SYSTEM
採熱システム
YAMAJI NORIYOSHI (author) / MATSUMOTO SHINSUKE (author) / TAKAHASHI KOSUKE (author)
2015-12-07
Patent
Electronic Resource
Japanese
IPC:
F28D
Wärmetauscher, soweit in keiner anderen Unterklasse vorgesehen, in denen die Wärmetauschmittel nicht in direkte Berührung miteinander kommen
,
HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E03F
SEWERS
,
Abwasserkanäle
HEAT COLLECTING PIPE EXECUTION METHOD AND HEAT COLLECTING PIPE EXECUTION TOOL
European Patent Office | 2016
|