A platform for research: civil engineering, architecture and urbanism
DEMOLITION METHOD AND DEMOLITION SYSTEM
PROBLEM TO BE SOLVED: To provide a demolition method that reduces costs for demolition work.SOLUTION: A demolition method comprises: steps S1, S2 for setting a crane installation floor 20 that includes a part of an existing floor 14 on a roof floor of an existing building 1 and installing a crane 30 on the crane installation floor 20, utilizing an existing column 11 that supports the crane installation floor 20 as a support column 11A; a step S3 for demolishing a part of the roof floor using the crane 30, excluding the crane installation floor 20 and the support column 11A; steps S4, S5 for lowering the crane installation floor 20 along the support column 11A; a step S6 for removing an upper part of the support column 11A; and steps S7, S8, S9 for repeating the processes.SELECTED DRAWING: Figure 5
【課題】解体作業にかかるコストを低減できる解体方法を提供すること。【解決手段】解体方法は、既存建物1の屋上階における既存床14の一部を含んでクレーン設置床20とし、このクレーン設置床20を支持する既存柱11を支持柱11Aとして、クレーン設置床20上にクレーン30を設置するステップS1、S2と、クレーン30を用いて、屋上階のうちクレーン設置床20および支持柱11Aを除いた部分を解体するステップS3と、クレーン設置床20を支持柱11Aに沿って下降させるステップS4、S5と、支持柱11Aの上部を撤去するステップS6と、これらの工程を繰り返すステップS7、S8、S9と、を備える。【選択図】図5
DEMOLITION METHOD AND DEMOLITION SYSTEM
PROBLEM TO BE SOLVED: To provide a demolition method that reduces costs for demolition work.SOLUTION: A demolition method comprises: steps S1, S2 for setting a crane installation floor 20 that includes a part of an existing floor 14 on a roof floor of an existing building 1 and installing a crane 30 on the crane installation floor 20, utilizing an existing column 11 that supports the crane installation floor 20 as a support column 11A; a step S3 for demolishing a part of the roof floor using the crane 30, excluding the crane installation floor 20 and the support column 11A; steps S4, S5 for lowering the crane installation floor 20 along the support column 11A; a step S6 for removing an upper part of the support column 11A; and steps S7, S8, S9 for repeating the processes.SELECTED DRAWING: Figure 5
【課題】解体作業にかかるコストを低減できる解体方法を提供すること。【解決手段】解体方法は、既存建物1の屋上階における既存床14の一部を含んでクレーン設置床20とし、このクレーン設置床20を支持する既存柱11を支持柱11Aとして、クレーン設置床20上にクレーン30を設置するステップS1、S2と、クレーン30を用いて、屋上階のうちクレーン設置床20および支持柱11Aを除いた部分を解体するステップS3と、クレーン設置床20を支持柱11Aに沿って下降させるステップS4、S5と、支持柱11Aの上部を撤去するステップS6と、これらの工程を繰り返すステップS7、S8、S9と、を備える。【選択図】図5
DEMOLITION METHOD AND DEMOLITION SYSTEM
解体方法および解体システム
ICHIHARA HIDEKI (author) / KAYASHIMA MAKOTO (author) / YAJIMA KIYOSHI (author) / SHIOZAWA SHIGEKI (author) / HIRASHIMA SHINICHI (author)
2016-02-01
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste