RUBBISH VOLUME REDUCING METHOD ON WASTE DISPOSAL SITE
PROBLEM TO BE SOLVED: To provide a rubbish volume reducing method which permits volume reduction and disposal capacity increase of a waste disposal site by forming a non-discharge drill hole on deposit waste in a waste disposal site, leaving a casing body within the non-discharge drill hole and projecting waste, and improves the operation efficiency of the rubbish volume reduction method.SOLUTION: When a drilling process, a back filling process and a pulling-out process are continuously repeated in the order around a drilling machine body 4 which performs the drilling process, at least two casing bodies are used, housing vertical holes b1, b2 which can house at least two casing bodies are formed beforehand within a movement range of the drilling machine body 4, it is repeated that a reservation casing body which is not used for drilling is temporarily deposited and housed in a housing vertical hole, a drilling rod separated from a drill hole-left casing body is inserted into a reservation casing body and is used for a subsequent drilling process upon the completion of the drilling process and a left casing body is pulled out in the pulling-out process and, thereafter, is erected on a housing vertical hole and is temporarily deposited and housed.SELECTED DRAWING: Figure 13
【課題】廃棄処分場において堆積廃棄物に無排出削孔を形成し、当該無排出削孔内にケーシング体を残置して廃棄物を投入し、これによって廃棄物処分場の減容・廃棄容積増大を実現するごみ減容処理工法を実施するに際して、その作業効率を高める。【解決手段】削孔工を実施する掘削機体4の周囲で、順次削孔工、埋め戻し工、引き抜き工を連続して繰り返すに際して、2個以上のケーシング体を使用し、掘削機体4の動作範囲内に少なくとも2個のケーシング体収納可能な収納縦孔b1,b2を予め形成しておき、掘削に使用していない控えケーシング体を収納縦孔に一時預け収納し、削孔工終了時に削孔残置ケーシング体から分離した掘削ロッドを、控えケーシング体内に差し入れて次回の削孔工に使用し、残置ケーシング体は引き抜き工において引き抜いた後、収納縦孔に立てて一時預け収納することを繰り返す。【選択図】図13
RUBBISH VOLUME REDUCING METHOD ON WASTE DISPOSAL SITE
PROBLEM TO BE SOLVED: To provide a rubbish volume reducing method which permits volume reduction and disposal capacity increase of a waste disposal site by forming a non-discharge drill hole on deposit waste in a waste disposal site, leaving a casing body within the non-discharge drill hole and projecting waste, and improves the operation efficiency of the rubbish volume reduction method.SOLUTION: When a drilling process, a back filling process and a pulling-out process are continuously repeated in the order around a drilling machine body 4 which performs the drilling process, at least two casing bodies are used, housing vertical holes b1, b2 which can house at least two casing bodies are formed beforehand within a movement range of the drilling machine body 4, it is repeated that a reservation casing body which is not used for drilling is temporarily deposited and housed in a housing vertical hole, a drilling rod separated from a drill hole-left casing body is inserted into a reservation casing body and is used for a subsequent drilling process upon the completion of the drilling process and a left casing body is pulled out in the pulling-out process and, thereafter, is erected on a housing vertical hole and is temporarily deposited and housed.SELECTED DRAWING: Figure 13
【課題】廃棄処分場において堆積廃棄物に無排出削孔を形成し、当該無排出削孔内にケーシング体を残置して廃棄物を投入し、これによって廃棄物処分場の減容・廃棄容積増大を実現するごみ減容処理工法を実施するに際して、その作業効率を高める。【解決手段】削孔工を実施する掘削機体4の周囲で、順次削孔工、埋め戻し工、引き抜き工を連続して繰り返すに際して、2個以上のケーシング体を使用し、掘削機体4の動作範囲内に少なくとも2個のケーシング体収納可能な収納縦孔b1,b2を予め形成しておき、掘削に使用していない控えケーシング体を収納縦孔に一時預け収納し、削孔工終了時に削孔残置ケーシング体から分離した掘削ロッドを、控えケーシング体内に差し入れて次回の削孔工に使用し、残置ケーシング体は引き抜き工において引き抜いた後、収納縦孔に立てて一時預け収納することを繰り返す。【選択図】図13
RUBBISH VOLUME REDUCING METHOD ON WASTE DISPOSAL SITE
廃棄物処分場におけるゴミ減容処理工法
KAWAURA EITARO (author) / HONMA YOSHINOBU (author)
2016-02-04
Patent
Electronic Resource
Japanese
Disposal of Municipal Refuse, and Rubbish Incineration
ASCE | 2021
|Emerald Group Publishing | 2005
|WASTE VOLUME REDUCTION PROCESSING METHOD FOR WASTE DISPOSAL SITE
European Patent Office | 2016