TEMPORARY COFFERING FACILITY FOR REPAIRING FLOOD SPILLWAY GATE OF DAM BODY
PROBLEM TO BE SOLVED: To provide a temporary coffering facility for repairing a flood spillway gate of a dam body that satisfactorily performs damming-up function at a time of normal water level, conducts water safely and securely at a time of flood, and offers high workability and economic efficiency.SOLUTION: A temporary coffering facility 25 is for reforming a flood spillway gate of a dam body 30. A damming-up mechanism comprises a rotatable door body 5 supported by a flexible hinge sheet 7 on a top surface of a foundation base 38, and flexible bag bodies 12 (A,B) installed on a downstream side of the door body 5. A flap gate 3 is configured such that when the bag bodies 12 (A,B) expand, a top part of the door body 5 is rotated to an erected position U at a height almost equivalent to a top part of a flood spillway gate 31, and when the bag bodies 12 (A,B) contract, a front surface of the door body 5 is rotated to a falling position D at a height almost equivalent to a bottom part of the flood spillway gate 31.SELECTED DRAWING: Figure 2
【課題】平水量時には堰止め機能を確実に発揮し、洪水時には安全かつ確実に通水させる機能を発揮し、施工性や経済性に優れたダム堤体の洪水吐ゲート改修用仮締め切り設備を提供する。【解決手段】ダム堤体30の洪水吐ゲート改修用仮締め切り設備25である。堰止め機構は、基礎台38の上面に可撓性のヒンジシート7で支持された回動可能な扉体5と、扉体5の下流側に設置された可撓性の袋体12(A,B)とで構成されている。袋体12(A,B)の膨張で、扉体5の上部が洪水吐ゲート31の上部に略相当する高さの起立位置Uに回動されるとともに、袋体12(A,B)の収縮で、扉体5の前面部が洪水吐ゲート31の下部に略相当する高さの倒伏位置Dに回動されるようになった起伏ゲート3である。【選択図】図2
TEMPORARY COFFERING FACILITY FOR REPAIRING FLOOD SPILLWAY GATE OF DAM BODY
PROBLEM TO BE SOLVED: To provide a temporary coffering facility for repairing a flood spillway gate of a dam body that satisfactorily performs damming-up function at a time of normal water level, conducts water safely and securely at a time of flood, and offers high workability and economic efficiency.SOLUTION: A temporary coffering facility 25 is for reforming a flood spillway gate of a dam body 30. A damming-up mechanism comprises a rotatable door body 5 supported by a flexible hinge sheet 7 on a top surface of a foundation base 38, and flexible bag bodies 12 (A,B) installed on a downstream side of the door body 5. A flap gate 3 is configured such that when the bag bodies 12 (A,B) expand, a top part of the door body 5 is rotated to an erected position U at a height almost equivalent to a top part of a flood spillway gate 31, and when the bag bodies 12 (A,B) contract, a front surface of the door body 5 is rotated to a falling position D at a height almost equivalent to a bottom part of the flood spillway gate 31.SELECTED DRAWING: Figure 2
【課題】平水量時には堰止め機能を確実に発揮し、洪水時には安全かつ確実に通水させる機能を発揮し、施工性や経済性に優れたダム堤体の洪水吐ゲート改修用仮締め切り設備を提供する。【解決手段】ダム堤体30の洪水吐ゲート改修用仮締め切り設備25である。堰止め機構は、基礎台38の上面に可撓性のヒンジシート7で支持された回動可能な扉体5と、扉体5の下流側に設置された可撓性の袋体12(A,B)とで構成されている。袋体12(A,B)の膨張で、扉体5の上部が洪水吐ゲート31の上部に略相当する高さの起立位置Uに回動されるとともに、袋体12(A,B)の収縮で、扉体5の前面部が洪水吐ゲート31の下部に略相当する高さの倒伏位置Dに回動されるようになった起伏ゲート3である。【選択図】図2
TEMPORARY COFFERING FACILITY FOR REPAIRING FLOOD SPILLWAY GATE OF DAM BODY
ダム堤体の洪水吐ゲート改修用仮締め切り設備
MATSUOKA HARUHIKO (author) / INABA KOICHI (author) / KUNUGINO YASUHIRO (author)
2016-03-22
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Repairing eroded spillway channel
Engineering Index Backfile | 1953
|Spillway Gate Forces-Montgomery Point Spillway
British Library Conference Proceedings | 1995
|Repairing the Wanapum Spillway Crack
British Library Conference Proceedings | 2015
|