A platform for research: civil engineering, architecture and urbanism
TEMPORARY SCAFFOLD FORMATION FOR CONSTRUCTION
PROBLEM TO BE SOLVED: To firmly provide a temporary scaffold formation to a vertical column so that an arrangement distance from the lower end becomes always uniform, by receiving and connecting an insertion engaging part of an end part of a horizontal column provided on the vertical column.SOLUTION: A temporary scaffold formation comprises a vertical column 10 erected in the vertical direction and formed by arranging a connection receiving part 20 of forming 2 or 4 pieces of U-shaped receiving parts inserted and connected in the vertical direction and a horizontal column 30 having an insertion engaging part 40 in both end parts inserted and connected into a connection receiving part 20 of the vertical column 10, and the connection receiving part 40 of the vertical column 10 is welded to a metal plate 50 by using a U-shaped receiving part 21 in a plan view, connection parts 21a, 22a, 23a and 25a for continuously forming the U-shaped receiving part 21, a column body 10A of the vertical column 10 provided in the connection parts 21a, 22a, 23a and 25a and any one or more of an elliptic hole, a circular hole, a triangular hole, a rectangular hole and a slit.SELECTED DRAWING: Figure 1
【課題】縦支柱に設けられた横支柱の端部の挿入係合部を受けて接続され、下端からの配設距離が常に均一になるようにし、縦支柱に対し堅固に設けられること。【解決手段】上下方向に立設され、前記上下方向に挿入されて接続される2乃至4個のコ字状の受部を形成してなる接続受部20を配設してなる縦支柱10と、縦支柱10の接続受部20に挿入されて接続される両端部に挿入係合部40を有する横支柱30とを具備し、縦支柱10の接続受部40は、金属板50に平面視でコ字状の受部21及び当該コ字状の受部21を連続形成した連結部21a,22a,23a,25a、及び前記連結部21a,22a,23a,25aに設けた縦支柱10の支柱本体10Aと長円孔、円孔、三角形孔、長方形孔、スリットの何れか1つ以上を用いて溶接したものである。【選択図】図1
TEMPORARY SCAFFOLD FORMATION FOR CONSTRUCTION
PROBLEM TO BE SOLVED: To firmly provide a temporary scaffold formation to a vertical column so that an arrangement distance from the lower end becomes always uniform, by receiving and connecting an insertion engaging part of an end part of a horizontal column provided on the vertical column.SOLUTION: A temporary scaffold formation comprises a vertical column 10 erected in the vertical direction and formed by arranging a connection receiving part 20 of forming 2 or 4 pieces of U-shaped receiving parts inserted and connected in the vertical direction and a horizontal column 30 having an insertion engaging part 40 in both end parts inserted and connected into a connection receiving part 20 of the vertical column 10, and the connection receiving part 40 of the vertical column 10 is welded to a metal plate 50 by using a U-shaped receiving part 21 in a plan view, connection parts 21a, 22a, 23a and 25a for continuously forming the U-shaped receiving part 21, a column body 10A of the vertical column 10 provided in the connection parts 21a, 22a, 23a and 25a and any one or more of an elliptic hole, a circular hole, a triangular hole, a rectangular hole and a slit.SELECTED DRAWING: Figure 1
【課題】縦支柱に設けられた横支柱の端部の挿入係合部を受けて接続され、下端からの配設距離が常に均一になるようにし、縦支柱に対し堅固に設けられること。【解決手段】上下方向に立設され、前記上下方向に挿入されて接続される2乃至4個のコ字状の受部を形成してなる接続受部20を配設してなる縦支柱10と、縦支柱10の接続受部20に挿入されて接続される両端部に挿入係合部40を有する横支柱30とを具備し、縦支柱10の接続受部40は、金属板50に平面視でコ字状の受部21及び当該コ字状の受部21を連続形成した連結部21a,22a,23a,25a、及び前記連結部21a,22a,23a,25aに設けた縦支柱10の支柱本体10Aと長円孔、円孔、三角形孔、長方形孔、スリットの何れか1つ以上を用いて溶接したものである。【選択図】図1
TEMPORARY SCAFFOLD FORMATION FOR CONSTRUCTION
建設用仮設足場構成体
KONDO TATSUYA (author)
2016-04-21
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
TEMPORARY SCAFFOLD AND CONSTRUCTION METHOD FOR TEMPORARY SCAFFOLD
European Patent Office | 2020
|TEMPORARY SCAFFOLD FOR CONSTRUCTION AND TEMPORARY SCAFFOLD INSTALLATION METHOD FOR CONSTRUCTION
European Patent Office | 2022
|