A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a panel construction method and a joint tape capable of achieving an openwork finish with improved workability.SOLUTION: In a panel construction method, a first panel 1a and a second panel 1b are pasted on a construction surface 3 so that a joint A in a prescribed width is formed between the first panel 1a and the second panel 1b, and the construction surface 3 at the joint A is covered with a joint tape. The panel construction method comprises: a first panel attaching process in which the first panel 1a is attached to the construction surface 3 and a clearance B is formed between an edge marginal part 13 of the first panel 1a and the construction surface 3; a joint tape insertion process in which one side end 4a of the joint tape is inserted in the clearance B; and a second panel attaching process in which the other side end 4b of the joint tape 4 is covered with the edge marginal part 13 of the second panel 1b and the second panel 1b is attached to the construction surface 3 with keeping a space of prescribed width between the first panel 1a and the second panel 1b.SELECTED DRAWING: Figure 2
【課題】作業性よく目透しに仕上げることができるパネル施工方法及び目地テープを提供する。【解決手段】第一パネル1a及び第二パネル1bの間に所定幅の目地Aが形成されるように第一パネル1a及び第二パネル1bを施工面3に貼り付けるとともに、目地Aにおいて施工面3を目地テープで覆うパネル施工方法であって、第一パネル1aを施工面3に貼り付けるとともに、第一パネル1aの端縁部13と施工面3との間に隙間Bを形成する第一パネル貼付工程と、目地テープの一方の側端部である目地テープ一方側端部4aを隙間Bに挿入する目地テープ挿入工程と、第二パネル1bの端縁部13で目地テープ4の他方の側端部である目地テープ他方側端部4bを覆い、第一パネル1aから所定幅を開けて第二パネル1bを施工面3に貼り付ける第二パネル貼付工程と、を備える。【選択図】図2
PROBLEM TO BE SOLVED: To provide a panel construction method and a joint tape capable of achieving an openwork finish with improved workability.SOLUTION: In a panel construction method, a first panel 1a and a second panel 1b are pasted on a construction surface 3 so that a joint A in a prescribed width is formed between the first panel 1a and the second panel 1b, and the construction surface 3 at the joint A is covered with a joint tape. The panel construction method comprises: a first panel attaching process in which the first panel 1a is attached to the construction surface 3 and a clearance B is formed between an edge marginal part 13 of the first panel 1a and the construction surface 3; a joint tape insertion process in which one side end 4a of the joint tape is inserted in the clearance B; and a second panel attaching process in which the other side end 4b of the joint tape 4 is covered with the edge marginal part 13 of the second panel 1b and the second panel 1b is attached to the construction surface 3 with keeping a space of prescribed width between the first panel 1a and the second panel 1b.SELECTED DRAWING: Figure 2
【課題】作業性よく目透しに仕上げることができるパネル施工方法及び目地テープを提供する。【解決手段】第一パネル1a及び第二パネル1bの間に所定幅の目地Aが形成されるように第一パネル1a及び第二パネル1bを施工面3に貼り付けるとともに、目地Aにおいて施工面3を目地テープで覆うパネル施工方法であって、第一パネル1aを施工面3に貼り付けるとともに、第一パネル1aの端縁部13と施工面3との間に隙間Bを形成する第一パネル貼付工程と、目地テープの一方の側端部である目地テープ一方側端部4aを隙間Bに挿入する目地テープ挿入工程と、第二パネル1bの端縁部13で目地テープ4の他方の側端部である目地テープ他方側端部4bを覆い、第一パネル1aから所定幅を開けて第二パネル1bを施工面3に貼り付ける第二パネル貼付工程と、を備える。【選択図】図2
PANEL CONSTRUCTION METHOD AND JOINT TAPE
パネル施工方法及び目地テープ
OBI TAKAHIRO (author)
2016-05-09
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
PANEL JOINT STRUCTURE AND CONSTRUCTION METHOD OF PANEL JOINT STRUCTURE
European Patent Office | 2024
|POLYESTER-BASED TAPE COMPOSITES FOR CONSTRUCTION PANEL REINFORCEMENT
European Patent Office | 2018
|