A platform for research: civil engineering, architecture and urbanism
BOX CULVERT AND CONSTRUCTION METHOD THEREFOR
PROBLEM TO BE SOLVED: To provide a box culvert capable of having both high workability and economy although using a precast concrete block, and a construction method therefor.SOLUTION: A box culvert 1 which is sectioned in a rectangular shape wider in a width direction W than in a height direction H consists of: a top gate type member 10 which has side wall upper parts 12 on both sides and a top part 11 constituted in one body and made of precast concrete, a side part L type member 20 which has a side wall body part 21 and a floor slab side part 22 constituted in one body and made of precast concrete, and a floor slab center member 30 made of cast-in-place concrete, a height-directional joint part 3 of the top gate type member 10 being composed of a rigid connection structure F, and a width-directional joint part 2 being composed of a hinge joint structure P.SELECTED DRAWING: Figure 1
【課題】プレキャストコンクリートブロックを用いながら、より高い施工性と経済性とを両立できるボックスカルバート及びその構築方法を提供することを目的とする。【解決手段】高さ方向Hに対して幅方向Wが広い矩形断面のボックスカルバート1を、両側の側壁上部12と頂部11とが一体構成され、プレキャストコンクリートで構成した頂部門型部材10と、側壁本体部21と床版側方部22とが一体構成され、プレキャストコンクリートで構成した側部L型部材20と、現場打ちコンクリートで構成した床版中央部材30とで構成し、頂部門型部材10における高さ方向接合部3を剛結構造Fで構成するとともに、幅方向接合部2をヒンジ接合構造Pで構成した。【選択図】図1
BOX CULVERT AND CONSTRUCTION METHOD THEREFOR
PROBLEM TO BE SOLVED: To provide a box culvert capable of having both high workability and economy although using a precast concrete block, and a construction method therefor.SOLUTION: A box culvert 1 which is sectioned in a rectangular shape wider in a width direction W than in a height direction H consists of: a top gate type member 10 which has side wall upper parts 12 on both sides and a top part 11 constituted in one body and made of precast concrete, a side part L type member 20 which has a side wall body part 21 and a floor slab side part 22 constituted in one body and made of precast concrete, and a floor slab center member 30 made of cast-in-place concrete, a height-directional joint part 3 of the top gate type member 10 being composed of a rigid connection structure F, and a width-directional joint part 2 being composed of a hinge joint structure P.SELECTED DRAWING: Figure 1
【課題】プレキャストコンクリートブロックを用いながら、より高い施工性と経済性とを両立できるボックスカルバート及びその構築方法を提供することを目的とする。【解決手段】高さ方向Hに対して幅方向Wが広い矩形断面のボックスカルバート1を、両側の側壁上部12と頂部11とが一体構成され、プレキャストコンクリートで構成した頂部門型部材10と、側壁本体部21と床版側方部22とが一体構成され、プレキャストコンクリートで構成した側部L型部材20と、現場打ちコンクリートで構成した床版中央部材30とで構成し、頂部門型部材10における高さ方向接合部3を剛結構造Fで構成するとともに、幅方向接合部2をヒンジ接合構造Pで構成した。【選択図】図1
BOX CULVERT AND CONSTRUCTION METHOD THEREFOR
ボックスカルバート及びその構築工法
OSUGA TAKAYUKI (author) / ARITA JUNICHI (author) / TANAKA YOSHITO (author)
2016-05-30
Patent
Electronic Resource
Japanese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Pollution discharge box culvert, box culvert construction method and box culvert repairing method
European Patent Office | 2020
|Box culvert construction method and box culvert structure
European Patent Office | 2024
|CULVERT CONNECTED BY SHEAR CONNECTING PLATE AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2016
|