A platform for research: civil engineering, architecture and urbanism
FOUNDATION SECTION CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a foundation section construction method capable of shortening a construction period.SOLUTION: A foundation section construction method comprises: a form assembling process to assemble a form 20; a foundation installation process to install a foundation section 50, having a column support section 51 to support an object column 70 and a foundation section column main reinforcement 52 inserted into the column support section 51 along a vertical direction, on a bottom section of a footing 30; a form filling process to place concrete in the form 20 up to an opening face thereof; and a column construction process to install the object column 70 on an upper surface of the column support section 51 before the form filling process or the concrete placed in the form filling process solidifies and develops reference strength.SELECTED DRAWING: Figure 1
【課題】施工期間を短縮する事が可能な基礎部施工方法を提供する。【解決手段】基礎部施工方法は、型枠20を形成する型枠形成工程と、対象柱70を支持するための柱支持部51と、柱支持部51に上下方向に沿って挿通された基礎部柱主筋52と、を備える土台部50を、フーチング30の底部に設置する土台設置工程と、コンクリートを型枠20の開口面まで充填されるように打設する型枠充填工程と、型枠充填工程の前において、又は型枠充填工程にて打設したコンクリートが基準となる強度まで固化する前において、対象柱70を柱支持部51の上面に載置する柱施工工程と、を含む。【選択図】図1
FOUNDATION SECTION CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a foundation section construction method capable of shortening a construction period.SOLUTION: A foundation section construction method comprises: a form assembling process to assemble a form 20; a foundation installation process to install a foundation section 50, having a column support section 51 to support an object column 70 and a foundation section column main reinforcement 52 inserted into the column support section 51 along a vertical direction, on a bottom section of a footing 30; a form filling process to place concrete in the form 20 up to an opening face thereof; and a column construction process to install the object column 70 on an upper surface of the column support section 51 before the form filling process or the concrete placed in the form filling process solidifies and develops reference strength.SELECTED DRAWING: Figure 1
【課題】施工期間を短縮する事が可能な基礎部施工方法を提供する。【解決手段】基礎部施工方法は、型枠20を形成する型枠形成工程と、対象柱70を支持するための柱支持部51と、柱支持部51に上下方向に沿って挿通された基礎部柱主筋52と、を備える土台部50を、フーチング30の底部に設置する土台設置工程と、コンクリートを型枠20の開口面まで充填されるように打設する型枠充填工程と、型枠充填工程の前において、又は型枠充填工程にて打設したコンクリートが基準となる強度まで固化する前において、対象柱70を柱支持部51の上面に載置する柱施工工程と、を含む。【選択図】図1
FOUNDATION SECTION CONSTRUCTION METHOD
基礎部施工方法
ISHIKAWA OSAMU (author)
2016-06-09
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Retaining structure for foundation pit section construction
European Patent Office | 2020
|Vacuum combined preloading construction method for soft foundation section
European Patent Office | 2021
|Movable tower crane section foundation and construction method thereof
European Patent Office | 2024
|European Patent Office | 2015
|