A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR GROUNDWATER PURIFICATION WALL WITH BUILT-IN OBSERVATION WELL, AND INPUT CAN
PROBLEM TO BE SOLVED: To provide a construction method for a groundwater purification wall with a built-in observation well that does not cause a problem in material separation and enables management of the underground purification wall, even when a groundwater purification material comprises a plurality of materials having different specific gravity values.SOLUTION: A construction method for a groundwater purification wall includes the following steps for: inserting a casing 20 into a ground G and erecting an observation well 30 inside the casing; filling a groundwater purification material M in an input can 10 comprising a can body 1 and a lower cover 2 fitted on the can body, after fitting a first hanging wire 4 to the can body 1 and a second hanging wire 3 to the lower cover, then hooking the wires 3, 4 to separate hanging wire hooks 5, 6 of a heavy machinery, then lowering the input can 10 into the observation well 30 without interference, using only the second hanging wire 3, then hanging the input can 10 with the first hanging wire 4, opening the lower cover 2 and dropping the groundwater purification material M, then lifting the input can 10 with the first hanging wire 4, hanging the input can 10 only with the second hanging wire 3, and filling the groundwater purification material M; and repeating the steps for constructing a groundwater purification wall 100.SELECTED DRAWING: Figure 8
【課題】地下水浄化材が比重の異なる複数の材料の混合材からなる場合でも材料分離の問題が生じ得ず、地下水浄化壁の管理を可能とする観測井戸を内蔵した地下水浄化壁の造成方法を提供すること。【解決手段】地盤Gにケーシング20を挿入して観測井戸30をその内部に建て込むステップ、缶本体1とこれに装着された下蓋2からなる投入缶10において、缶本体1に第1の吊ワイヤ4、下蓋に第2の吊ワイヤ3を取り付けて地下水浄化材Mを詰め、ワイヤ3,4を重機の有する別途の吊ワイヤフック5,6に掛け、第2の吊ワイヤ3のみで投入缶10を観測井戸30に干渉しないようにして吊り下し、第1の吊ワイヤ4に投入缶10を吊らせて下蓋2を開いて地下水浄化材Mを落とし込み、第1の吊ワイヤ4にて投入缶10を吊り上げ、第2の吊ワイヤ3のみで投入缶10を吊って地下水浄化材Mを詰めるステップ、このステップを繰り返して地下水浄化壁100を造成するステップからなる。【選択図】図8
CONSTRUCTION METHOD FOR GROUNDWATER PURIFICATION WALL WITH BUILT-IN OBSERVATION WELL, AND INPUT CAN
PROBLEM TO BE SOLVED: To provide a construction method for a groundwater purification wall with a built-in observation well that does not cause a problem in material separation and enables management of the underground purification wall, even when a groundwater purification material comprises a plurality of materials having different specific gravity values.SOLUTION: A construction method for a groundwater purification wall includes the following steps for: inserting a casing 20 into a ground G and erecting an observation well 30 inside the casing; filling a groundwater purification material M in an input can 10 comprising a can body 1 and a lower cover 2 fitted on the can body, after fitting a first hanging wire 4 to the can body 1 and a second hanging wire 3 to the lower cover, then hooking the wires 3, 4 to separate hanging wire hooks 5, 6 of a heavy machinery, then lowering the input can 10 into the observation well 30 without interference, using only the second hanging wire 3, then hanging the input can 10 with the first hanging wire 4, opening the lower cover 2 and dropping the groundwater purification material M, then lifting the input can 10 with the first hanging wire 4, hanging the input can 10 only with the second hanging wire 3, and filling the groundwater purification material M; and repeating the steps for constructing a groundwater purification wall 100.SELECTED DRAWING: Figure 8
【課題】地下水浄化材が比重の異なる複数の材料の混合材からなる場合でも材料分離の問題が生じ得ず、地下水浄化壁の管理を可能とする観測井戸を内蔵した地下水浄化壁の造成方法を提供すること。【解決手段】地盤Gにケーシング20を挿入して観測井戸30をその内部に建て込むステップ、缶本体1とこれに装着された下蓋2からなる投入缶10において、缶本体1に第1の吊ワイヤ4、下蓋に第2の吊ワイヤ3を取り付けて地下水浄化材Mを詰め、ワイヤ3,4を重機の有する別途の吊ワイヤフック5,6に掛け、第2の吊ワイヤ3のみで投入缶10を観測井戸30に干渉しないようにして吊り下し、第1の吊ワイヤ4に投入缶10を吊らせて下蓋2を開いて地下水浄化材Mを落とし込み、第1の吊ワイヤ4にて投入缶10を吊り上げ、第2の吊ワイヤ3のみで投入缶10を吊って地下水浄化材Mを詰めるステップ、このステップを繰り返して地下水浄化壁100を造成するステップからなる。【選択図】図8
CONSTRUCTION METHOD FOR GROUNDWATER PURIFICATION WALL WITH BUILT-IN OBSERVATION WELL, AND INPUT CAN
観測井戸を内蔵した地下水浄化壁の造成方法と投入缶
KYODA KOSUKE (author) / ONO SHU (author) / SUZUKI SHIGEYOSHI (author) / NEGISHI MASANORI (author) / OISHI MASAYA (author) / SHOJI HIROYUKI (author)
2016-06-20
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
WELL STRUCTURE, GROUNDWATER PURIFICATION SYSTEM AND GROUNDWATER PURIFICATION METHOD
European Patent Office | 2020
|WATER SAMPLING PORT UNIT USED FOR GROUNDWATER OBSERVATION WELL AND GROUNDWATER OBSERVATION WELL
European Patent Office | 2022
|Temporarily-built inner wall surface construction method
European Patent Office | 2024
|European Patent Office | 2022
|European Patent Office | 2023
|