A platform for research: civil engineering, architecture and urbanism
DISPLACEMENT IMPARTING JIG
PROBLEM TO BE SOLVED: To provide a displacement imparting jig that readily imparts displacement to a rail at high accuracy and prevents tilting of the rail, when developing a slab track.SOLUTION: A displacement imparting jig 1 is a jig for imparting displacement to a rail 4 of a slab track 2. The displacement imparting jig 1 includes a fixture 5, a pushing jig 6, a wedge 7, and a screw 8. The fixture 5 is a member brought in contact with a side surface 311 of a groove part 31 of a slab 3. The pushing jig 6 is for pushing a bottom part side surface 41 of the rail 4, and is disposed on the fixture 5 in a displaceable way. The wedge 7 is sandwiched between the fixture 5 and the pushing jig 6. The screw 8 is for fitting the wedge 7 on the fixture 5. The pushing jig 6 is brought in contact with the bottom part side surface 41 of the rail 4. The wedge 7 displaces the pushing jig 6 in a direction away from the side surface 311 of the groove part 31, as the screw 8 is rotated. Thus, the rail 4 is pushed by the pushing jig 6 and is imparted displacement.SELECTED DRAWING: Figure 3
【課題】スラブ軌道の整備において、レールに高い精度で移動量を容易に付与することができるとともに、レールが小返りした状態になることが防がれる移動量付与治具を提供する。【解決手段】移動量付与治具1は、スラブ軌道2のレール4に移動量を付与するための治具である。移動量付与治具1は、固定具5と、押し具6と、楔7と、ねじ8とを有する。固定具5は、スラブ3の溝部31の側面311に当接される部材である。押し具6は、レール4の底部側面41を押すための部材であり、固定具5に変位自在に設けられる。楔7は、固定具5と押し具6との間に挟まれる。ねじ8は、楔7を固定具5に取り付ける。押し具6は、レール4の底部側面41に当接される。楔7は、ねじ8が回されることによって、溝部31の側面311から遠ざける方向に押し具6を変位させる。これにより、レール4は、押し具6に押され、移動量が付与される。【選択図】図3
DISPLACEMENT IMPARTING JIG
PROBLEM TO BE SOLVED: To provide a displacement imparting jig that readily imparts displacement to a rail at high accuracy and prevents tilting of the rail, when developing a slab track.SOLUTION: A displacement imparting jig 1 is a jig for imparting displacement to a rail 4 of a slab track 2. The displacement imparting jig 1 includes a fixture 5, a pushing jig 6, a wedge 7, and a screw 8. The fixture 5 is a member brought in contact with a side surface 311 of a groove part 31 of a slab 3. The pushing jig 6 is for pushing a bottom part side surface 41 of the rail 4, and is disposed on the fixture 5 in a displaceable way. The wedge 7 is sandwiched between the fixture 5 and the pushing jig 6. The screw 8 is for fitting the wedge 7 on the fixture 5. The pushing jig 6 is brought in contact with the bottom part side surface 41 of the rail 4. The wedge 7 displaces the pushing jig 6 in a direction away from the side surface 311 of the groove part 31, as the screw 8 is rotated. Thus, the rail 4 is pushed by the pushing jig 6 and is imparted displacement.SELECTED DRAWING: Figure 3
【課題】スラブ軌道の整備において、レールに高い精度で移動量を容易に付与することができるとともに、レールが小返りした状態になることが防がれる移動量付与治具を提供する。【解決手段】移動量付与治具1は、スラブ軌道2のレール4に移動量を付与するための治具である。移動量付与治具1は、固定具5と、押し具6と、楔7と、ねじ8とを有する。固定具5は、スラブ3の溝部31の側面311に当接される部材である。押し具6は、レール4の底部側面41を押すための部材であり、固定具5に変位自在に設けられる。楔7は、固定具5と押し具6との間に挟まれる。ねじ8は、楔7を固定具5に取り付ける。押し具6は、レール4の底部側面41に当接される。楔7は、ねじ8が回されることによって、溝部31の側面311から遠ざける方向に押し具6を変位させる。これにより、レール4は、押し具6に押され、移動量が付与される。【選択図】図3
DISPLACEMENT IMPARTING JIG
移動量付与治具
ITONAGA YUKIE (author) / ONO TAKASHI (author) / YASUOKA HIDEYUKI (author) / FUKUDA KOSUKE (author) / YAMAZAKI SHIMIZU (author) / SASAKI YOSHITSUGU (author) / MORIZANE SHINJI (author) / KODERA HISASHI (author)
2016-08-04
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
MODERATE FEELING IMPARTING MEMBER AND FAUCET WITH MODERATE FEELING IMPARTING MEMBER
European Patent Office | 2019
|