A platform for research: civil engineering, architecture and urbanism
STEEL PIPE JOINT STRUCTURE AND CONCRETE CONSTRUCTION REINFORCEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a steel pipe joint structure and a concrete construction reinforcement structure which install a steel pipe body at a predetermined position in a hole section on a concrete construction, achieve sufficient joining of a plurality of steel pipe bodies, and significantly improve filling property of a filling material.SOLUTION: A steel pipe joint structure 1 to join a plurality of steel pipes in a pipe axial direction Y, comprises: a plurality of steel pipe bodies 2 to be inserted into a hole section 80 provided on a concrete construction; and a joint section 5 which join the plurality of steel pipe bodies 2 in the pipe axial direction Y. One of the plurality of steel pipe bodies 2 to be joined in the pipe axial direction Y has a first pipe edge section 25 and the other steel pipe body 2 to be joined in the pipe axial direction Y has a second pipe edge section 27. A joint section 5 joins the first pipe edge section 25 and the second pipe edge section 27 in the pipe axial direction Y with an edge face 25a of the first edge section 25 and the edge face 27a of the second edge section 27 arranged opposite to each other in the pipe axial direction Y with a space in between.SELECTED DRAWING: Figure 2
【課題】コンクリート構造物の孔部の所定の位置に鋼管本体を設置するとともに、複数の鋼管本体の連結を十分なものとして、さらに、充填材の充填性を大幅に向上させた鋼管の継手構造及びコンクリート構造物の補強構造を提供する。【解決手段】複数の鋼管を管軸方向Yに連結するための鋼管の継手構造1に関する。本発明を適用した鋼管の継手構造1は、コンクリート構造物の孔部80に挿入される複数の鋼管本体2と、複数の鋼管本体2を管軸方向Yに連結させる継手部5とを備える。複数の鋼管本体2は、管軸方向Yに連結される一方の鋼管本体2が第1管端部25を有するとともに、管軸方向Yに連結される他方の鋼管本体2が第2管端部27を有する。継手部5は、第1管端部25の端面25aと第2管端部27の端面27aとを管軸方向Yに対向させるとともに離間させて、第1管端部25と第2管端部27とを管軸方向Yで互いに連結させるものである。【選択図】図2
STEEL PIPE JOINT STRUCTURE AND CONCRETE CONSTRUCTION REINFORCEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a steel pipe joint structure and a concrete construction reinforcement structure which install a steel pipe body at a predetermined position in a hole section on a concrete construction, achieve sufficient joining of a plurality of steel pipe bodies, and significantly improve filling property of a filling material.SOLUTION: A steel pipe joint structure 1 to join a plurality of steel pipes in a pipe axial direction Y, comprises: a plurality of steel pipe bodies 2 to be inserted into a hole section 80 provided on a concrete construction; and a joint section 5 which join the plurality of steel pipe bodies 2 in the pipe axial direction Y. One of the plurality of steel pipe bodies 2 to be joined in the pipe axial direction Y has a first pipe edge section 25 and the other steel pipe body 2 to be joined in the pipe axial direction Y has a second pipe edge section 27. A joint section 5 joins the first pipe edge section 25 and the second pipe edge section 27 in the pipe axial direction Y with an edge face 25a of the first edge section 25 and the edge face 27a of the second edge section 27 arranged opposite to each other in the pipe axial direction Y with a space in between.SELECTED DRAWING: Figure 2
【課題】コンクリート構造物の孔部の所定の位置に鋼管本体を設置するとともに、複数の鋼管本体の連結を十分なものとして、さらに、充填材の充填性を大幅に向上させた鋼管の継手構造及びコンクリート構造物の補強構造を提供する。【解決手段】複数の鋼管を管軸方向Yに連結するための鋼管の継手構造1に関する。本発明を適用した鋼管の継手構造1は、コンクリート構造物の孔部80に挿入される複数の鋼管本体2と、複数の鋼管本体2を管軸方向Yに連結させる継手部5とを備える。複数の鋼管本体2は、管軸方向Yに連結される一方の鋼管本体2が第1管端部25を有するとともに、管軸方向Yに連結される他方の鋼管本体2が第2管端部27を有する。継手部5は、第1管端部25の端面25aと第2管端部27の端面27aとを管軸方向Yに対向させるとともに離間させて、第1管端部25と第2管端部27とを管軸方向Yで互いに連結させるものである。【選択図】図2
STEEL PIPE JOINT STRUCTURE AND CONCRETE CONSTRUCTION REINFORCEMENT STRUCTURE
鋼管の継手構造及びコンクリート構造物の補強構造
YOKOZEKI KOICHI (author) / TOMINAGA NORIYOSHI (author)
2016-09-01
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
REINFORCEMENT STEEL PIPE AND CONCRETE CONSTRUCTION REINFORCEMENT STRUCTURE
European Patent Office | 2016
|European Patent Office | 2024
|European Patent Office | 2023
|STEEL PIPE REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD OF STEEL PIPE
European Patent Office | 2017
|