A platform for research: civil engineering, architecture and urbanism
TEMPORARY WALL AND TEMPORARY WALL CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a temporary wall and a temporary wall construction method capable of easily and quickly constructing and removing the temporary wall, while securing sufficient water cutoff performance by a plurality of precast concrete blocks.SOLUTION: A temporary wall 1 of applying the present invention comprises a plurality of precast concrete blocks 2 provided on a side surface of at least a part of a box body of a pneumatic caisson and provided by stacking upward from below and a water cutoff material 3 provided in a clearance S of the plurality of precast concrete blocks 2. The plurality of precast concrete blocks 2 are integrally installed above a substructure of the box body before sinking the box body, and after sinking the box body, the respective precast concrete blocks 2 are mutually separated, and are removed to the side of the box body from a space formed above the substructure of the box body.SELECTED DRAWING: Figure 4
【課題】複数のプレキャストコンクリートブロックで十分な止水性能を確保しながら、仮壁の構築及び撤去を容易かつ迅速に実施することのできる仮壁及び仮壁工法を提供する。【解決手段】本発明を適用した仮壁1は、ニューマチックケーソンの函体の少なくとも一部の側面に設けられるものであり、下方から上方に積み上げて設けられる複数のプレキャストコンクリートブロック2と、複数のプレキャストコンクリートブロック2の間隙Sに設けられる止水材3とを備える。複数のプレキャストコンクリートブロック2は、函体を沈設させる前に、函体の下部構造の上方に一体化させて設置されるとともに、函体を沈設させた後に、各々のプレキャストコンクリートブロック2が、互いに分離されて、函体の下部構造の上方に形成された空間から、函体の側方に撤去される。【選択図】図4
TEMPORARY WALL AND TEMPORARY WALL CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a temporary wall and a temporary wall construction method capable of easily and quickly constructing and removing the temporary wall, while securing sufficient water cutoff performance by a plurality of precast concrete blocks.SOLUTION: A temporary wall 1 of applying the present invention comprises a plurality of precast concrete blocks 2 provided on a side surface of at least a part of a box body of a pneumatic caisson and provided by stacking upward from below and a water cutoff material 3 provided in a clearance S of the plurality of precast concrete blocks 2. The plurality of precast concrete blocks 2 are integrally installed above a substructure of the box body before sinking the box body, and after sinking the box body, the respective precast concrete blocks 2 are mutually separated, and are removed to the side of the box body from a space formed above the substructure of the box body.SELECTED DRAWING: Figure 4
【課題】複数のプレキャストコンクリートブロックで十分な止水性能を確保しながら、仮壁の構築及び撤去を容易かつ迅速に実施することのできる仮壁及び仮壁工法を提供する。【解決手段】本発明を適用した仮壁1は、ニューマチックケーソンの函体の少なくとも一部の側面に設けられるものであり、下方から上方に積み上げて設けられる複数のプレキャストコンクリートブロック2と、複数のプレキャストコンクリートブロック2の間隙Sに設けられる止水材3とを備える。複数のプレキャストコンクリートブロック2は、函体を沈設させる前に、函体の下部構造の上方に一体化させて設置されるとともに、函体を沈設させた後に、各々のプレキャストコンクリートブロック2が、互いに分離されて、函体の下部構造の上方に形成された空間から、函体の側方に撤去される。【選択図】図4
TEMPORARY WALL AND TEMPORARY WALL CONSTRUCTION METHOD
仮壁及び仮壁工法
OSHIDA HIDEJI (author) / ABE SHINTARO (author) / YUASA TAKUO (author) / NAMIKI TOMOKAZU (author)
2016-09-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
TEMPORARY PROTECTIVE WALL AND TEMPORARY PROTECTIVE WALL CONSTRUCTION METHOD
European Patent Office | 2019
|Temporary soundproof wall temporary fence and its construction method
European Patent Office | 2020
|