A platform for research: civil engineering, architecture and urbanism
STEEL PIPE WALL TEMPORARY CONSTRUCTION
The present invention relates to a riverside facility of a circular steel pipe wall. To achieve the purpose of the present invention, the riverside facility of the circular steel pipe wall includes: a wall constructed by multiple support units, embedded to a bedrock layer and arranged in predetermined intervals, and multiple steel pipes installed along the outer circumference of the support units; and a moving prevention support unit installed in a horizontal direction of the support unit between the support units and a waling installed in the horizontal direction of the support unit on the inner side of the support unit, wherein the moving prevention support unit is arranged at a same height as that of the waling. According to the present invention, the riverside facility of the circular steel pipe wall improves a cutoff effect of flow water using a soil layer in comparison with the wall comprising an existing sheet pile as the wall is formed of the multiple steel pipes with a gap blocking unit. A cement mortar is placed into a lower end of the steel pipe before the excavation to form a first cutoff wall, and, therefore, construction ability is improved. As a process of installing and removing a cutoff member is unnecessary, the riverside facility of the circular steel pipe wall can reduce construction periods and construction costs.
상기와 같은 목적을 달성하기 위한 본 발명은 암반층까지 근입되며 미리 정해진 간격으로 배치되는 복수개의 지주대와, 상기 복수개의 지주대의 바깥쪽 둘레를 따라 복수개의 강관으로 배치되는 벽체와, 상기 지주대의 안쪽에 상기 지주대의 가로 방향으로 마련되는 띠장과, 상기 복수개의 지주대 사이에 지주대의 가로 방향으로 마련되되, 상기 띠장과 같은 높이에 마련되는 밀림방지용지주대; 를 포함하는 것을 특징으로 하는 원형 강관 벽체 강가시설이 제공된다. 이상에서 살펴본 바와 같이 본 발명에 따른 원형 강관 벽체 강가시설에 따르면, 틈새차단부가 형성된 복수개의 강관으로 벽체를 이룸으로써 종래의 시트 파일로 형성된 벽체보다 토사층을 통한 유입수의 차수 효과가 향상되며, 굴토 전에 상기 강관의 하단부로 시멘트 몰탈을 채워 넣어 선차수벽을 형성함으로써 시공성이 향상되고, 차수부재를 설치 및 제거하는 공정이 필요 없어 시공기간이 단축되며, 공사비 절감의 효과를 얻을 수 있다.
STEEL PIPE WALL TEMPORARY CONSTRUCTION
The present invention relates to a riverside facility of a circular steel pipe wall. To achieve the purpose of the present invention, the riverside facility of the circular steel pipe wall includes: a wall constructed by multiple support units, embedded to a bedrock layer and arranged in predetermined intervals, and multiple steel pipes installed along the outer circumference of the support units; and a moving prevention support unit installed in a horizontal direction of the support unit between the support units and a waling installed in the horizontal direction of the support unit on the inner side of the support unit, wherein the moving prevention support unit is arranged at a same height as that of the waling. According to the present invention, the riverside facility of the circular steel pipe wall improves a cutoff effect of flow water using a soil layer in comparison with the wall comprising an existing sheet pile as the wall is formed of the multiple steel pipes with a gap blocking unit. A cement mortar is placed into a lower end of the steel pipe before the excavation to form a first cutoff wall, and, therefore, construction ability is improved. As a process of installing and removing a cutoff member is unnecessary, the riverside facility of the circular steel pipe wall can reduce construction periods and construction costs.
상기와 같은 목적을 달성하기 위한 본 발명은 암반층까지 근입되며 미리 정해진 간격으로 배치되는 복수개의 지주대와, 상기 복수개의 지주대의 바깥쪽 둘레를 따라 복수개의 강관으로 배치되는 벽체와, 상기 지주대의 안쪽에 상기 지주대의 가로 방향으로 마련되는 띠장과, 상기 복수개의 지주대 사이에 지주대의 가로 방향으로 마련되되, 상기 띠장과 같은 높이에 마련되는 밀림방지용지주대; 를 포함하는 것을 특징으로 하는 원형 강관 벽체 강가시설이 제공된다. 이상에서 살펴본 바와 같이 본 발명에 따른 원형 강관 벽체 강가시설에 따르면, 틈새차단부가 형성된 복수개의 강관으로 벽체를 이룸으로써 종래의 시트 파일로 형성된 벽체보다 토사층을 통한 유입수의 차수 효과가 향상되며, 굴토 전에 상기 강관의 하단부로 시멘트 몰탈을 채워 넣어 선차수벽을 형성함으로써 시공성이 향상되고, 차수부재를 설치 및 제거하는 공정이 필요 없어 시공기간이 단축되며, 공사비 절감의 효과를 얻을 수 있다.
STEEL PIPE WALL TEMPORARY CONSTRUCTION
원형 강관 벽체 강가시설
KIM YOUNG SOO (author) / PAPK GI JU (author)
2016-08-22
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
TEMPORARY RETAINING WALL STRUCTURE USING CIRCULAR STEEL PIPE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2020
|construction method for the construction of temporary soundproof wall by using a steel pipe casing
European Patent Office | 2025