EARTH REMOVING METHOD BASED ON PNEUMATIC CAISSON METHOD
PROBLEM TO BE SOLVED: To provide a simple earth removing method capable of improving drilling efficiency.SOLUTION: In an earth removing method based on the pneumatic caisson method, following processes are carried out in a parallel way: a drilled sediment loading process, which uses a stage 3 with a space in which two removed earth buckets 4 (4A, 4B) on a material shaft 14, a first lifting crane 5, which suspends and moves the removed earth bucket 4 in a range between the stage 3 and a workroom 13 in the material shaft 14, and a second lifting crane 24 that moves the removed earth bucket 4 in a range between the stage 3 and a sediment hopper 25, and loads drilled sediment in the removed earth bucket 4 in the workroom 13 using the first lifting crane 5 and lifts up the removed earth bucket 4 to the stage 3; a sediment discharge process, which uses the second lifting crane 24 to move the removed earth bucket 4 containing the sediment on the stage 3 to the sediment hopper 25 and discharge the sediment.SELECTED DRAWING: Figure 1
【課題】簡単な排土方法により掘削効率を向上させることができる。【解決手段】マテリアルシャフト14上に2つの排土バケット4(4A、4B)を配置するスペースを有するステージ3と、マテリアルシャフト14内で排土バケット4を吊り下ろしステージ3と作業室13内との間の範囲で移動させるための第1揚重クレーン5と、ステージ3と土砂ホッパ25との間の範囲で排土バケット4を移動させるための第2揚重クレーン24と、を備え、第1揚重クレーン5を使用し作業室13で排土バケット4に掘削土砂を積込み、その積み込んだ排土バケット4をステージ3に吊り上げる掘削土砂積込み工程と、第2揚重クレーン24を使用しステージ3にある土砂が積み込まれた排土バケット4を土砂ホッパ25へ移動させて排出する土砂排出工程と、が並行作業により行われるニューマチックケーソン工法における排土方法を提供する。【選択図】図1
EARTH REMOVING METHOD BASED ON PNEUMATIC CAISSON METHOD
PROBLEM TO BE SOLVED: To provide a simple earth removing method capable of improving drilling efficiency.SOLUTION: In an earth removing method based on the pneumatic caisson method, following processes are carried out in a parallel way: a drilled sediment loading process, which uses a stage 3 with a space in which two removed earth buckets 4 (4A, 4B) on a material shaft 14, a first lifting crane 5, which suspends and moves the removed earth bucket 4 in a range between the stage 3 and a workroom 13 in the material shaft 14, and a second lifting crane 24 that moves the removed earth bucket 4 in a range between the stage 3 and a sediment hopper 25, and loads drilled sediment in the removed earth bucket 4 in the workroom 13 using the first lifting crane 5 and lifts up the removed earth bucket 4 to the stage 3; a sediment discharge process, which uses the second lifting crane 24 to move the removed earth bucket 4 containing the sediment on the stage 3 to the sediment hopper 25 and discharge the sediment.SELECTED DRAWING: Figure 1
【課題】簡単な排土方法により掘削効率を向上させることができる。【解決手段】マテリアルシャフト14上に2つの排土バケット4(4A、4B)を配置するスペースを有するステージ3と、マテリアルシャフト14内で排土バケット4を吊り下ろしステージ3と作業室13内との間の範囲で移動させるための第1揚重クレーン5と、ステージ3と土砂ホッパ25との間の範囲で排土バケット4を移動させるための第2揚重クレーン24と、を備え、第1揚重クレーン5を使用し作業室13で排土バケット4に掘削土砂を積込み、その積み込んだ排土バケット4をステージ3に吊り上げる掘削土砂積込み工程と、第2揚重クレーン24を使用しステージ3にある土砂が積み込まれた排土バケット4を土砂ホッパ25へ移動させて排出する土砂排出工程と、が並行作業により行われるニューマチックケーソン工法における排土方法を提供する。【選択図】図1
EARTH REMOVING METHOD BASED ON PNEUMATIC CAISSON METHOD
ニューマチックケーソン工法における排土方法
KANEMARU KIYOTO (author) / KONO SHIGEYUKI (author) / OTOMO NOBUYOSHI (author) / ASAKA TAKATOSHI (author) / ASO TOSHIMITSU (author) / FUKUTOMI YASUSUKE (author) / KONDO TOSHIHIRO (author)
2016-09-08
Patent
Electronic Resource
Japanese