PROBLEM TO BE SOLVED: To provide a side gutter installed along a boundary between a driveway and a footway.SOLUTION: A side gutter 1 includes a square cylindrical side gutter body 2 and a curb stone 3 mounted on the side gutter body 2, and is installed along a boundary between a driveway and a footway. The side gutter body 2 is formed by a bottom plate 4, a pair of side plates 5 extending from the bottom plate 4 to face each other, and a top plate 6 continuing from the side plate 5 above the bottom plate 4. The top plate 6 includes a high top plate part 7 having a top surface on a driveway side formed high, a low top plate part 8 having a top plate on a footway side formed lower than the high top plate part 7, a plurality of recesses 9 cut out on a stepped part between the high top plate part 7 and the low top plate part 8, and a hole part 10 formed continuously below the plurality of recesses 9 through the top plate 6. The curb stone 3 is mounted on the low top plate part 8 so as to cover an open part of the plurality of recesses 9, and a water collecting port 11 is formed to continue with the hole part 10 along with the plurality of recesses 9.SELECTED DRAWING: Figure 1
【課題】本発明は、車道と歩道との境界に沿って配置される側溝に関するものである。【解決手段】角筒状の側溝本体2と、側溝本体2に載置される縁石3と、を備え、車道と歩道との境界に沿って配置される側溝1であって、側溝本体2は、底板4と、底板4から突設された対向する一対の側板5と、側板5から連設されて底板4の上方に形成された天板6と、を有して形成され、天板6は、車道側の上面が高く形成された天板高部7と、歩道側の上面が天板高部7より低く形成された天板低部8と、天板高部7と天板低部8との段差部が切り欠かれた複数の凹部9と、複数の凹部9の下方にそれぞれ連なり天板6を貫通して形成された孔部10と、を備え、縁石3は、複数の凹部9の開口部分を塞ぐように天板低部8に載置されて、複数の凹部9と共に孔部10に連続する集水口11を形成することを特徴とする。【選択図】図1
SIDE GUTTER
PROBLEM TO BE SOLVED: To provide a side gutter installed along a boundary between a driveway and a footway.SOLUTION: A side gutter 1 includes a square cylindrical side gutter body 2 and a curb stone 3 mounted on the side gutter body 2, and is installed along a boundary between a driveway and a footway. The side gutter body 2 is formed by a bottom plate 4, a pair of side plates 5 extending from the bottom plate 4 to face each other, and a top plate 6 continuing from the side plate 5 above the bottom plate 4. The top plate 6 includes a high top plate part 7 having a top surface on a driveway side formed high, a low top plate part 8 having a top plate on a footway side formed lower than the high top plate part 7, a plurality of recesses 9 cut out on a stepped part between the high top plate part 7 and the low top plate part 8, and a hole part 10 formed continuously below the plurality of recesses 9 through the top plate 6. The curb stone 3 is mounted on the low top plate part 8 so as to cover an open part of the plurality of recesses 9, and a water collecting port 11 is formed to continue with the hole part 10 along with the plurality of recesses 9.SELECTED DRAWING: Figure 1
【課題】本発明は、車道と歩道との境界に沿って配置される側溝に関するものである。【解決手段】角筒状の側溝本体2と、側溝本体2に載置される縁石3と、を備え、車道と歩道との境界に沿って配置される側溝1であって、側溝本体2は、底板4と、底板4から突設された対向する一対の側板5と、側板5から連設されて底板4の上方に形成された天板6と、を有して形成され、天板6は、車道側の上面が高く形成された天板高部7と、歩道側の上面が天板高部7より低く形成された天板低部8と、天板高部7と天板低部8との段差部が切り欠かれた複数の凹部9と、複数の凹部9の下方にそれぞれ連なり天板6を貫通して形成された孔部10と、を備え、縁石3は、複数の凹部9の開口部分を塞ぐように天板低部8に載置されて、複数の凹部9と共に孔部10に連続する集水口11を形成することを特徴とする。【選択図】図1
SIDE GUTTER
側溝
MATSUZAKI HIDEO (author) / NAKASU MIKIO (author)
2016-09-15
Patent
Electronic Resource
Japanese
IPC:
E03F
SEWERS
,
Abwasserkanäle
SIDE GUTTER COVER, SIDE GUTTER AND CONSTRUCTION METHOD THEREFOR