STRUCTURE AND METHOD FOR RESTRAINING TRACK DISPLACEMENT
PROBLEM TO BE SOLVED: To provide a structure and a method for retraining track displacement that can restrain track displacement by ensuring integrity between a sleeper and a ballast layer.SOLUTION: A structure 10 for restraining track displacement restrains track displacement by mitigating jumping-up of a ballast 8a occurring when a load of a train 1 is removed suddenly after the train 1 passes over a track 4. An integrating member 11 integrates the ballast 8a with a sleeper 6 for restraining jumping-up of the ballast 8a occurring when the load of the train 1 that passes over the track 4 is removed suddenly. An insertion member 12 is inserted into a ballast 8. A connecting member 13 connects the insertion member 12 with the sleeper 6. The connecting member 13 is wound around and binds the sleeper 6 and the insertion member 12 such that the ballast 8a is sandwiched between the sleeper 6 and the insertion member 12, and gives prescribed tensile force among the sleeper, the insertion member, and the ballast 8a.SELECTED DRAWING: Figure 1
【課題】まくらぎとバラスト層との一体性を確保することによって軌道変位を抑制することができる軌道変位抑制構造及び軌道変位抑制方法を提供する。【解決手段】軌道変位抑制構造10は、軌道4上を列車1が通過して列車1の荷重が急激に除荷されたときに発生する道床バラスト8aの跳ね上がりを低減することによって軌道変位を抑制する。一体化部材11は、軌道4上を通過する列車1の荷重が除荷されるときに発生する道床バラスト8aの跳ね上がりを抑制するために、この道床バラスト8aとまくらぎ6とを一体化する。挿入部材12は、道床8に挿入される。連結部材13は、挿入部材12とまくらぎ6とを連結する。連結部材13は、まくらぎ6と挿入部材12との間に道床バラスト8aが挟み込まれるように、まくらぎ6と挿入部材12とに巻き付けてこれらを結束しており、これらの間に所定の張力を付与している。【選択図】図1
STRUCTURE AND METHOD FOR RESTRAINING TRACK DISPLACEMENT
PROBLEM TO BE SOLVED: To provide a structure and a method for retraining track displacement that can restrain track displacement by ensuring integrity between a sleeper and a ballast layer.SOLUTION: A structure 10 for restraining track displacement restrains track displacement by mitigating jumping-up of a ballast 8a occurring when a load of a train 1 is removed suddenly after the train 1 passes over a track 4. An integrating member 11 integrates the ballast 8a with a sleeper 6 for restraining jumping-up of the ballast 8a occurring when the load of the train 1 that passes over the track 4 is removed suddenly. An insertion member 12 is inserted into a ballast 8. A connecting member 13 connects the insertion member 12 with the sleeper 6. The connecting member 13 is wound around and binds the sleeper 6 and the insertion member 12 such that the ballast 8a is sandwiched between the sleeper 6 and the insertion member 12, and gives prescribed tensile force among the sleeper, the insertion member, and the ballast 8a.SELECTED DRAWING: Figure 1
【課題】まくらぎとバラスト層との一体性を確保することによって軌道変位を抑制することができる軌道変位抑制構造及び軌道変位抑制方法を提供する。【解決手段】軌道変位抑制構造10は、軌道4上を列車1が通過して列車1の荷重が急激に除荷されたときに発生する道床バラスト8aの跳ね上がりを低減することによって軌道変位を抑制する。一体化部材11は、軌道4上を通過する列車1の荷重が除荷されるときに発生する道床バラスト8aの跳ね上がりを抑制するために、この道床バラスト8aとまくらぎ6とを一体化する。挿入部材12は、道床8に挿入される。連結部材13は、挿入部材12とまくらぎ6とを連結する。連結部材13は、まくらぎ6と挿入部材12との間に道床バラスト8aが挟み込まれるように、まくらぎ6と挿入部材12とに巻き付けてこれらを結束しており、これらの間に所定の張力を付与している。【選択図】図1
STRUCTURE AND METHOD FOR RESTRAINING TRACK DISPLACEMENT
軌道変位抑制構造及び軌道変位抑制方法
AIKAWA AKIRA (author)
2016-10-20
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
COLUMN CAPITAL DISPLACEMENT RESTRAINING STRUCTURE OF BUILDING
European Patent Office | 2019
|Restraining fitting and method for restraining structure skeleton
European Patent Office | 2022
|RESTRAINING FITTING AND METHOD FOR RESTRAINING STRUCTURE SKELETON
European Patent Office | 2021
|RESTRAINING FITTING AND METHOD FOR RESTRAINING STRUCTURE SKELETON
European Patent Office | 2018
|Ancient building column foot displacement restraining device and method