LANE REGULATION METHOD USING CONCRETE GUARD FENCE AND CONCRETE GUARD FENCE
PROBLEM TO BE SOLVED: To provide a concrete guard fence from which a block in the middle of a length direction can be singly and easily removed.SOLUTION: A concrete guard fence comprises: lower hang-out blocks 2 in which lower hang-out parts 5 are protrusively arranged at both-side lower parts in a length direction; upper hang-out blocks 3 in which upper hang-out parts 6 arranged on the lower hang-out parts 5 are protrusively arranged at both-side upper parts in the length direction; and a steel pipe 15 which connects the lower hang-out blocks 2 and the upper hang-out blocks 3 in a state that the upper hang-out parts 6 of the upper hang-out block 3 are arranged on the lower hang-out parts 5 of the lower hang-out block 2. By releasing the connection by the steel pipe 15, the upper hang-out block 3 in the middle can be lifted and removed. Furthermore, by removing the upper hang-out blocks 3, 3 at both sides, the lower hang-out block 2 in the middle can be lifted and removed.SELECTED DRAWING: Figure 4
【課題】長さ方向途中のブロックを単独で容易に取り外しできるコンクリートガードフェンスを提供する。【解決手段】下張出部5を長さ方向両側下部に突設した下張出ブロック2と、下張出部5の上に配置する上張出部6を長さ方向両側上部に突設した上張出ブロック3と、下張出ブロック2の下張出部5の上に上張出ブロック3の上張出部6を配置した状態で、下張出ブロック2と上張出ブロック3を連結する鋼管15とを備える。鋼管15による連結を解除することにより、途中の上張出ブロック3を持ち上げて取り外すことができる。また、両側の上張出ブロック3,3を取り外すことにより、間の下張出ブロック2を持ち上げて取り外すことができる。【選択図】図4
LANE REGULATION METHOD USING CONCRETE GUARD FENCE AND CONCRETE GUARD FENCE
PROBLEM TO BE SOLVED: To provide a concrete guard fence from which a block in the middle of a length direction can be singly and easily removed.SOLUTION: A concrete guard fence comprises: lower hang-out blocks 2 in which lower hang-out parts 5 are protrusively arranged at both-side lower parts in a length direction; upper hang-out blocks 3 in which upper hang-out parts 6 arranged on the lower hang-out parts 5 are protrusively arranged at both-side upper parts in the length direction; and a steel pipe 15 which connects the lower hang-out blocks 2 and the upper hang-out blocks 3 in a state that the upper hang-out parts 6 of the upper hang-out block 3 are arranged on the lower hang-out parts 5 of the lower hang-out block 2. By releasing the connection by the steel pipe 15, the upper hang-out block 3 in the middle can be lifted and removed. Furthermore, by removing the upper hang-out blocks 3, 3 at both sides, the lower hang-out block 2 in the middle can be lifted and removed.SELECTED DRAWING: Figure 4
【課題】長さ方向途中のブロックを単独で容易に取り外しできるコンクリートガードフェンスを提供する。【解決手段】下張出部5を長さ方向両側下部に突設した下張出ブロック2と、下張出部5の上に配置する上張出部6を長さ方向両側上部に突設した上張出ブロック3と、下張出ブロック2の下張出部5の上に上張出ブロック3の上張出部6を配置した状態で、下張出ブロック2と上張出ブロック3を連結する鋼管15とを備える。鋼管15による連結を解除することにより、途中の上張出ブロック3を持ち上げて取り外すことができる。また、両側の上張出ブロック3,3を取り外すことにより、間の下張出ブロック2を持ち上げて取り外すことができる。【選択図】図4
LANE REGULATION METHOD USING CONCRETE GUARD FENCE AND CONCRETE GUARD FENCE
コンクリートガードフェンスを用いた車線規制方法およびコンクリートガードフェンス
NISHIKAWA YOSUKE (author) / MATSUZAKI SUSUMU (author) / KIMURA RYOSUKE (author) / OSAWA TERUMASA (author) / SHICHIKU TSUNEHIRO (author) / MIOKA ZENPEI (author) / TAKAHASHI JUNICHI (author) / UCHIDA HIROSHI (author) / MIZOTA NORIFUMI (author)
2016-11-10
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2020
|CONCRETE HEAVY STRUCTURE, CONCRETE HEAVY STRUCTURE WITH GUARD FENCE, AND GUARD FENCE STRUCTURE
European Patent Office | 2019
|