CONCRETE GUARD FENCE
PROBLEM TO BE SOLVED: To provide a concrete guard fence by which a block in the middle of the lengthwise direction can be removed independently and easily.SOLUTION: A concrete guard fence comprises a lower projecting block 2 in which a lower projecting part 5 is protruded at the lower part of both sides of the lengthwise direction, an upper projecting block 3 in which an upper projecting part 6 arranged on the lower projecting part 5 is protruded at the upper part of both sides of the lengthwise direction, and a steel pipe 15 which connects the lower projecting block 2 with the upper projecting block 3 in a state that the upper projecting part 6 of the upper projecting block 3 is arranged on the lower projecting part 5 of the lower projecting block 2. By releasing the connection by the steel pipe 15, the upper projecting block 3 in the middle can be lifted and removed. By removing the upper projecting blocks 3 and 3 on both sides, the lower projecting block 2 between the upper projecting blocks can be lifted and removed.SELECTED DRAWING: Figure 4
【課題】長さ方向途中のブロックを単独で容易に取り外しできるコンクリートガードフェンスを提供する。【解決手段】下張出部5を長さ方向両側下部に突設した下張出ブロック2と、下張出部5の上に配置する上張出部6を長さ方向両側上部に突設した上張出ブロック3と、下張出ブロック2の下張出部5の上に上張出ブロック3の上張出部6を配置した状態で、下張出ブロック2と上張出ブロック3を連結する鋼管15とを備える。鋼管15による連結を解除することにより、途中の上張出ブロック3を持ち上げて取り外すことができる。また、両側の上張出ブロック3,3を取り外すことにより、間の下張出ブロック2を持ち上げて取り外すことができる。【選択図】図4
CONCRETE GUARD FENCE
PROBLEM TO BE SOLVED: To provide a concrete guard fence by which a block in the middle of the lengthwise direction can be removed independently and easily.SOLUTION: A concrete guard fence comprises a lower projecting block 2 in which a lower projecting part 5 is protruded at the lower part of both sides of the lengthwise direction, an upper projecting block 3 in which an upper projecting part 6 arranged on the lower projecting part 5 is protruded at the upper part of both sides of the lengthwise direction, and a steel pipe 15 which connects the lower projecting block 2 with the upper projecting block 3 in a state that the upper projecting part 6 of the upper projecting block 3 is arranged on the lower projecting part 5 of the lower projecting block 2. By releasing the connection by the steel pipe 15, the upper projecting block 3 in the middle can be lifted and removed. By removing the upper projecting blocks 3 and 3 on both sides, the lower projecting block 2 between the upper projecting blocks can be lifted and removed.SELECTED DRAWING: Figure 4
【課題】長さ方向途中のブロックを単独で容易に取り外しできるコンクリートガードフェンスを提供する。【解決手段】下張出部5を長さ方向両側下部に突設した下張出ブロック2と、下張出部5の上に配置する上張出部6を長さ方向両側上部に突設した上張出ブロック3と、下張出ブロック2の下張出部5の上に上張出ブロック3の上張出部6を配置した状態で、下張出ブロック2と上張出ブロック3を連結する鋼管15とを備える。鋼管15による連結を解除することにより、途中の上張出ブロック3を持ち上げて取り外すことができる。また、両側の上張出ブロック3,3を取り外すことにより、間の下張出ブロック2を持ち上げて取り外すことができる。【選択図】図4
CONCRETE GUARD FENCE
コンクリートガードフェンス
NISHIKAWA YOSUKE (author) / MATSUZAKI SUSUMU (author) / KIMURA RYOSUKE (author) / OSAWA TERUMASA (author) / SHICHIKU TSUNEHIRO (author) / MIOKA ZENPEI (author) / TAKAHASHI JUNICHI (author) / UCHIDA HIROSHI (author) / MIZOTA NORIFUMI (author)
2016-11-04
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
LANE REGULATION METHOD USING CONCRETE GUARD FENCE AND CONCRETE GUARD FENCE
European Patent Office | 2016
|CONCRETE HEAVY STRUCTURE, CONCRETE HEAVY STRUCTURE WITH GUARD FENCE, AND GUARD FENCE STRUCTURE
European Patent Office | 2019
|European Patent Office | 2020
|