CONSTRUCTION METHOD OF UNDERWATER PILE
PROBLEM TO BE SOLVED: To enhance accuracy of positioning of a pile underwater, while curtailing a construction period and reducing a construction cost.SOLUTION: A pile center positioning member 1 is for positioning a pile center of a pile 70 installed on a water bottom ground, and includes a concrete template body part 10 of a flat-plate form, the template body part 10 having a guide pipe 21 installed thereon for positioning the pile 70. A plurality of the template body parts 10 is provided, and a steel edge part frame 11 having a flange 11a is formed on an outer peripheral edge part of the template body part. A connecting plate member 33 is overlapped on the flanges 11a, 11a and spanned between the adjacent template body parts 10, 10, and each flange 11a and the connecting plate member 33 are sandwiched by a fitting jig 30, to fix the template body parts 10, 10 to each other.SELECTED DRAWING: Figure 1
【課題】工期と工費の短縮を図りつつ、水中での杭の位置決め精度を高める。【解決手段】水底地盤に打設される杭70の杭芯位置決めを行うための杭芯位置決め部材1であって、平板状に形成されたコンクリート造のテンプレート本体部10を有し、テンプレート本体部10には、前記杭70を位置決めするためのガイド管21が設けられていることを特徴とする。テンプレート本体部10は、複数設けられており、テンプレート本体部の外周縁部には、フランジ11aを備えた鋼製の縁部枠組11が形成され、隣り合うテンプレート本体部10,10のフランジ11a,11aに連結プレート部材33を重ね合わせて架け渡すとともに、それぞれのフランジ11aと連結プレート部材33同士を取付治具30にて挟持することで、テンプレート本体部10,10同士が固定されている。【選択図】図1
CONSTRUCTION METHOD OF UNDERWATER PILE
PROBLEM TO BE SOLVED: To enhance accuracy of positioning of a pile underwater, while curtailing a construction period and reducing a construction cost.SOLUTION: A pile center positioning member 1 is for positioning a pile center of a pile 70 installed on a water bottom ground, and includes a concrete template body part 10 of a flat-plate form, the template body part 10 having a guide pipe 21 installed thereon for positioning the pile 70. A plurality of the template body parts 10 is provided, and a steel edge part frame 11 having a flange 11a is formed on an outer peripheral edge part of the template body part. A connecting plate member 33 is overlapped on the flanges 11a, 11a and spanned between the adjacent template body parts 10, 10, and each flange 11a and the connecting plate member 33 are sandwiched by a fitting jig 30, to fix the template body parts 10, 10 to each other.SELECTED DRAWING: Figure 1
【課題】工期と工費の短縮を図りつつ、水中での杭の位置決め精度を高める。【解決手段】水底地盤に打設される杭70の杭芯位置決めを行うための杭芯位置決め部材1であって、平板状に形成されたコンクリート造のテンプレート本体部10を有し、テンプレート本体部10には、前記杭70を位置決めするためのガイド管21が設けられていることを特徴とする。テンプレート本体部10は、複数設けられており、テンプレート本体部の外周縁部には、フランジ11aを備えた鋼製の縁部枠組11が形成され、隣り合うテンプレート本体部10,10のフランジ11a,11aに連結プレート部材33を重ね合わせて架け渡すとともに、それぞれのフランジ11aと連結プレート部材33同士を取付治具30にて挟持することで、テンプレート本体部10,10同士が固定されている。【選択図】図1
CONSTRUCTION METHOD OF UNDERWATER PILE
水中杭の施工方法
HADATE YUKITOSHI (author) / EGAWA SHOJI (author) / ENDO TAKAHIRO (author) / KANEKO HIDEYUKI (author) / NODA TAKASHI (author) / URAGAMI NOBORU (author)
2016-11-17
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD FOR UNDERWATER PIPE PILE FOUNDATION AND UNDERWATER PIPE PILE FOUNDATION