PROBLEM TO BE SOLVED: To provide a frame, a frame unit, a mold for frame unit and a frame unit construction method designed to mitigate burdens in work at a construction site.SOLUTION: A net-form frame 4A for a vertical frame is used with a slope frame construction method, to be covered over a vertical reinforcing bar 3A extending in a direction of connecting a slope top and a slope toe along a slope surface N, and sprayed with a cement mixture. The frame includes: a plurality of installation wire materials 41A for the vertical reinforcing bar installed in a direction of extension of the vertical reinforcing bar 3A with an interval, each of the plurality of installation wire materials crossing over the vertical reinforcing bar 3A in a direction orthogonal to the direction of extension of the vertical reinforcing bar 3A; and a plurality of extension wire materials 41B for the vertical reinforcing bar extending in the same direction as the vertical reinforcing bar 3A and having the plurality of installation wire materials 41A for the vertical reinforcing bar connected thereto. All of the plurality of extension wire materials 41B for the vertical reinforcing bar is located above a lateral lower reinforcing bar 31B.SELECTED DRAWING: Figure 2
【課題】現場作業の負担を軽減する工夫がなされた、フレーム、フレームユニット、法枠用型枠および法枠工法を提供する。【解決手段】法枠工法に用いられ、法面Nに沿って法肩と法尻を結ぶ方向に延在する縦鉄筋3Aに被せられ、セメント混合物が吹き付けられる網状の縦梁用フレーム4Aであって、縦鉄筋3Aの延在方向に間隔をあけて設けられそれぞれが縦鉄筋3Aの延在方向と直交する方向に縦鉄筋3Aを跨ぐ複数の縦鉄筋用架設線材41Aと、縦鉄筋3Aと同じ方向に延在し複数の縦鉄筋用架設線材41Aが接続された複数の縦鉄筋用延伸線材41Bとを有し、複数の縦鉄筋用延伸線材41Bは総て、横下鉄筋31Bよりも上方に位置するものである。【選択図】図2
PROBLEM TO BE SOLVED: To provide a frame, a frame unit, a mold for frame unit and a frame unit construction method designed to mitigate burdens in work at a construction site.SOLUTION: A net-form frame 4A for a vertical frame is used with a slope frame construction method, to be covered over a vertical reinforcing bar 3A extending in a direction of connecting a slope top and a slope toe along a slope surface N, and sprayed with a cement mixture. The frame includes: a plurality of installation wire materials 41A for the vertical reinforcing bar installed in a direction of extension of the vertical reinforcing bar 3A with an interval, each of the plurality of installation wire materials crossing over the vertical reinforcing bar 3A in a direction orthogonal to the direction of extension of the vertical reinforcing bar 3A; and a plurality of extension wire materials 41B for the vertical reinforcing bar extending in the same direction as the vertical reinforcing bar 3A and having the plurality of installation wire materials 41A for the vertical reinforcing bar connected thereto. All of the plurality of extension wire materials 41B for the vertical reinforcing bar is located above a lateral lower reinforcing bar 31B.SELECTED DRAWING: Figure 2
【課題】現場作業の負担を軽減する工夫がなされた、フレーム、フレームユニット、法枠用型枠および法枠工法を提供する。【解決手段】法枠工法に用いられ、法面Nに沿って法肩と法尻を結ぶ方向に延在する縦鉄筋3Aに被せられ、セメント混合物が吹き付けられる網状の縦梁用フレーム4Aであって、縦鉄筋3Aの延在方向に間隔をあけて設けられそれぞれが縦鉄筋3Aの延在方向と直交する方向に縦鉄筋3Aを跨ぐ複数の縦鉄筋用架設線材41Aと、縦鉄筋3Aと同じ方向に延在し複数の縦鉄筋用架設線材41Aが接続された複数の縦鉄筋用延伸線材41Bとを有し、複数の縦鉄筋用延伸線材41Bは総て、横下鉄筋31Bよりも上方に位置するものである。【選択図】図2
FRAME, FRAME UNIT, MOLD FOR SLOPE FRAME, AND SLOPE FRAME CONSTRUCTION METHOD
フレーム、フレームユニット、法枠用型枠および法枠工法
ASUKE RYU (author)
2016-12-01
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SLOPE FRAME CONSTRUCTION METHOD USING STEEL SLOPE FRAME MEMBER
European Patent Office | 2019
|European Patent Office | 2020
|SLOPE FRAME MOLDING MACHINE AND SLOPE FRAME CONSTRUCTION METHOD
European Patent Office | 2018
|