A platform for research: civil engineering, architecture and urbanism
CONCRETE FLOOR SLAB
PROBLEM TO BE SOLVED: To provide a concrete floor slab installed on a girder and prestressed in an axial direction of the girder at a connection of a precast concrete slab, the concrete floor slab being formed efficiently and facilitating replacement thereof.SOLUTION: Tensioning materials 25a, 25b are placed to diagonally cross a joint surface 24 between first precast concrete slab 2a and a second precast concrete slab 2b that are adjacent to each other, from the first precast concrete slab 2a toward the second precast concrete slab 2b, and then are curved to cross the joint surface again from the second precast concrete slab 2b toward the first precast concrete slab 2a. Tensioning force is introduced to the tensioning materials, and both edge parts of the tensioning materials are anchored to edges of the precast concrete slabs 2a, 2b that are orthogonal to an axial line of the girder.SELECTED DRAWING: Figure 2
【課題】桁上に配列されたプレキャストコンクリート版の連結部分で桁の軸線方向にプレストレスが導入されたコンクリート床版であって、効率よく形成することができるとともに、プレキャストコンクリート版の交換を容易に行うことができるコンクリート床版を提供する。【解決手段】隣り合う第1のプレキャストコンクリート版2aと第2のプレキャストコンクリート版2bとの接合面24を、第1のプレキャストコンクリート版2aから前記第2のプレキャストコンクリート版2bへ斜めに横切り、湾曲して再び第2のプレキャストコンクリート版2bから第1のプレキャストコンクリート版2aへ接合面を横切るように緊張材25a,25bが配置されている。緊張材には緊張力が導入されて、両端部がプレキャストコンクリート版2a,2bの桁の軸線と直角となる方向の端部に定着されている。【選択図】図2
CONCRETE FLOOR SLAB
PROBLEM TO BE SOLVED: To provide a concrete floor slab installed on a girder and prestressed in an axial direction of the girder at a connection of a precast concrete slab, the concrete floor slab being formed efficiently and facilitating replacement thereof.SOLUTION: Tensioning materials 25a, 25b are placed to diagonally cross a joint surface 24 between first precast concrete slab 2a and a second precast concrete slab 2b that are adjacent to each other, from the first precast concrete slab 2a toward the second precast concrete slab 2b, and then are curved to cross the joint surface again from the second precast concrete slab 2b toward the first precast concrete slab 2a. Tensioning force is introduced to the tensioning materials, and both edge parts of the tensioning materials are anchored to edges of the precast concrete slabs 2a, 2b that are orthogonal to an axial line of the girder.SELECTED DRAWING: Figure 2
【課題】桁上に配列されたプレキャストコンクリート版の連結部分で桁の軸線方向にプレストレスが導入されたコンクリート床版であって、効率よく形成することができるとともに、プレキャストコンクリート版の交換を容易に行うことができるコンクリート床版を提供する。【解決手段】隣り合う第1のプレキャストコンクリート版2aと第2のプレキャストコンクリート版2bとの接合面24を、第1のプレキャストコンクリート版2aから前記第2のプレキャストコンクリート版2bへ斜めに横切り、湾曲して再び第2のプレキャストコンクリート版2bから第1のプレキャストコンクリート版2aへ接合面を横切るように緊張材25a,25bが配置されている。緊張材には緊張力が導入されて、両端部がプレキャストコンクリート版2a,2bの桁の軸線と直角となる方向の端部に定着されている。【選択図】図2
CONCRETE FLOOR SLAB
コンクリート床版
FUJIWARA YASUHISA (author) / ANDO NAOFUMI (author) / KUMAGAI YUJI (author)
2016-12-15
Patent
Electronic Resource
Japanese
CONCRETE FLOOR SLAB AND CONCRETE FLOOR SLAB FORMING METHOD
European Patent Office | 2021
|European Patent Office | 2019
|LIGHTWEIGHT CONCRETE FLOOR SLAB AND LIGHTWEIGHT CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2023
|