A platform for research: civil engineering, architecture and urbanism
SAND CONTROL DAM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a sand control dam construction method capable of constructing a sand control dam by a simple method at low cost.SOLUTION: A capture material 7 comprises multiple column bodies 3 and a wire net 5 that is disposed between the column bodies 3. The capture material 7 allows fine sand and water to penetrate and captures sediment 11 larger than a certain size. According to this invention, the sediment 11 captured by the capture material 7 is solidified and used instead of being removed. A solidification filler starts to solidify after a predetermined time and forms a solidification part 15 by solidifying the sediment. The sediment 11 is integrated at the solidification part 15 to become a structure. As the sediment 11 is entirely integrated and substantially horizontal site is formed in a predetermined range, the sediment can be used as a sand control dam.SELECTED DRAWING: Figure 5
【課題】簡易方法で、低コストで砂防堰堤を構築することが可能な、砂防堰堤の構築方法を提供する。【解決手段】捕捉材7は、複数の柱体3と、柱体3同士の間に設けられるワイヤネット5とから構成される。捕捉材7は、細かな砂や水は透過するが、ある程度のサイズ以上の土砂11を捕捉するものである。本発明では、捕捉材7で捕捉された土砂11を撤去するのではなく、固化して利用する。固化充填材は所定時間経過すると固化を開始し、土砂を固化して固化部15を形成する。すなわち、土砂11は、固化部15で一体化して構造体となる。土砂11が全体として一体化され、所定の範囲に略水平である部位が形成されるため、砂防堰堤として利用することができる。【選択図】図5
SAND CONTROL DAM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a sand control dam construction method capable of constructing a sand control dam by a simple method at low cost.SOLUTION: A capture material 7 comprises multiple column bodies 3 and a wire net 5 that is disposed between the column bodies 3. The capture material 7 allows fine sand and water to penetrate and captures sediment 11 larger than a certain size. According to this invention, the sediment 11 captured by the capture material 7 is solidified and used instead of being removed. A solidification filler starts to solidify after a predetermined time and forms a solidification part 15 by solidifying the sediment. The sediment 11 is integrated at the solidification part 15 to become a structure. As the sediment 11 is entirely integrated and substantially horizontal site is formed in a predetermined range, the sediment can be used as a sand control dam.SELECTED DRAWING: Figure 5
【課題】簡易方法で、低コストで砂防堰堤を構築することが可能な、砂防堰堤の構築方法を提供する。【解決手段】捕捉材7は、複数の柱体3と、柱体3同士の間に設けられるワイヤネット5とから構成される。捕捉材7は、細かな砂や水は透過するが、ある程度のサイズ以上の土砂11を捕捉するものである。本発明では、捕捉材7で捕捉された土砂11を撤去するのではなく、固化して利用する。固化充填材は所定時間経過すると固化を開始し、土砂を固化して固化部15を形成する。すなわち、土砂11は、固化部15で一体化して構造体となる。土砂11が全体として一体化され、所定の範囲に略水平である部位が形成されるため、砂防堰堤として利用することができる。【選択図】図5
SAND CONTROL DAM CONSTRUCTION METHOD
砂防堰堤の構築方法
YAMADA TAKEMINE (author) / SHIRASAGI TAKU (author)
2016-12-22
Patent
Electronic Resource
Japanese
Sand blocking plate, sand blocking device and sand blocking device construction method
European Patent Office | 2022
|