DEVICE AND PROGRAM FOR SIMULATION OF GROUT CONSTRUCTION, AND GROUT CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To perform design and construction of a grout hole easily and quickly in the grout construction for excavating a grout hole in the bedrock scheduled of tunnel excavation.SOLUTION: A device 30 for simulation of grout construction is provided for simulating the grout construction in which grout holes 20 are conically disposed from the facing 3 of a tunnel 1. The device includes an input unit 34, a simulation unit 35 and a display unit 36. The simulation unit 35 calculates excavation vectors of the grout holes 20 assuming a reference point 10 as a starting point, based on a reference point 10 of the grout holes 20, an azimuth angle A, a slant angle θd, a first distance L, a second distance R and an angle θn. The simulation unit displays results of the simulation in which the grout holes 20 are virtually disposed in the tunnel 1, based on this excavation vectors on a display unit 36.SELECTED DRAWING: Figure 6
【課題】坑道掘削予定の岩盤にグラウト孔を掘削するグラウト工事において、グラウト孔の設計及び施工を容易且つ迅速に行う。【解決手段】坑道1の切羽3から円錐状にグラウト孔20を配置するグラウト工事のシミュレーションを行うグラウト工事のシミュレーション装置30であって、入力部34と、シミュレーション部35と、表示部36とを備え、シミュレーション部35は、グラウト孔20の基準点10、方位角度A、傾斜角度θd、第1の距離L、第2の距離R、角度θnとに基づいて、基準点10を出発点とするグラウト孔20の掘削ベクトルを算出して、この掘削ベクトルに基づいて坑道1にグラウト孔20を仮想的に配置したシミュレーションの結果を表示部36に表示する。【選択図】図6
DEVICE AND PROGRAM FOR SIMULATION OF GROUT CONSTRUCTION, AND GROUT CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To perform design and construction of a grout hole easily and quickly in the grout construction for excavating a grout hole in the bedrock scheduled of tunnel excavation.SOLUTION: A device 30 for simulation of grout construction is provided for simulating the grout construction in which grout holes 20 are conically disposed from the facing 3 of a tunnel 1. The device includes an input unit 34, a simulation unit 35 and a display unit 36. The simulation unit 35 calculates excavation vectors of the grout holes 20 assuming a reference point 10 as a starting point, based on a reference point 10 of the grout holes 20, an azimuth angle A, a slant angle θd, a first distance L, a second distance R and an angle θn. The simulation unit displays results of the simulation in which the grout holes 20 are virtually disposed in the tunnel 1, based on this excavation vectors on a display unit 36.SELECTED DRAWING: Figure 6
【課題】坑道掘削予定の岩盤にグラウト孔を掘削するグラウト工事において、グラウト孔の設計及び施工を容易且つ迅速に行う。【解決手段】坑道1の切羽3から円錐状にグラウト孔20を配置するグラウト工事のシミュレーションを行うグラウト工事のシミュレーション装置30であって、入力部34と、シミュレーション部35と、表示部36とを備え、シミュレーション部35は、グラウト孔20の基準点10、方位角度A、傾斜角度θd、第1の距離L、第2の距離R、角度θnとに基づいて、基準点10を出発点とするグラウト孔20の掘削ベクトルを算出して、この掘削ベクトルに基づいて坑道1にグラウト孔20を仮想的に配置したシミュレーションの結果を表示部36に表示する。【選択図】図6
DEVICE AND PROGRAM FOR SIMULATION OF GROUT CONSTRUCTION, AND GROUT CONSTRUCTION METHOD
グラウト工事のシミュレーション装置、グラウト工事のシミュレーションプログラム及びグラウト工法
MENTANI TATSUHIKO (author)
2016-12-28
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
GROUT REINJECTION AUTOMATIC CONSTRUCTION SYSTEM AND GROUT REINJECTION AUTOMATIC CONSTRUCTION METHOD
European Patent Office | 2020
|PC GROUT FILLING STATE MONITORING METHOD AND PC GROUT CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2016
|