METHOD AND DEVICE FOR CHECKING IMPROVEMENT RADIUS OF IMPROVEMENT BODY
PROBLEM TO BE SOLVED: To provide a method and a device for checking whether or not improvement radius of an improvement body during establishment in a high-pressure injection mixing method has reached a designed improvement radius during establishment of the improvement body.SOLUTION: An arrival pipe 5, which is a cylindrical steel pipe, is inserted in a ground 6 in advance at a position B at a distance L corresponding to a designed improvement radius from a position A where an injection pipe 4 is inserted in the ground 6 before the injection pipe 4 is inserted into the ground 6. Subsequently, the injection pipe 4 is inserted into the ground 6 by lowering the pipe downward while rotating the pipe. When the injection pipe 4 reached a predetermined depth, lowering of the injection pipe 4 is stopped. A solidification material slurry is injected from a nozzle 9 while the injection pipe 4 is pulled up at a predetermined speed while the injection pipe 4 is rotated at predetermined revolution speed. An acceleration sensor 10 detects acceleration generated on the arrival pipe 5 and transfers the detection result to a recording meter 11 while the injection pipe 4 is pulled up.SELECTED DRAWING: Figure 1
【課題】高圧噴射攪拌工法において造成中の改良体の改良半径が設計改良半径に達しているか否かを改良体の造成中に確認する方法及び装置を提供する。【解決手段】注入管4を地盤6に挿入する前に、注入管4が地盤6に挿入される位置Aから、設計改良半径に相当する距離Lだけ離れた位置Bに、円筒形状を有する鉄製の管である到達管5を予め地盤6に挿入しておく。次に、注入管4を回転させながら下降させて地盤6に挿入する。注入管4を所定の深さまで挿入したら、注入管4の下降を止める。注入管4を所定回転数で回転させながら所定の速度で注入管4を引き上げると共にノズル9から固化材スラリーが噴射される。注入管4を引き上げる間、加速度センサー10は、到達管5に生じる加速度を検知し、検知結果を記録計11に伝送する。【選択図】図1
METHOD AND DEVICE FOR CHECKING IMPROVEMENT RADIUS OF IMPROVEMENT BODY
PROBLEM TO BE SOLVED: To provide a method and a device for checking whether or not improvement radius of an improvement body during establishment in a high-pressure injection mixing method has reached a designed improvement radius during establishment of the improvement body.SOLUTION: An arrival pipe 5, which is a cylindrical steel pipe, is inserted in a ground 6 in advance at a position B at a distance L corresponding to a designed improvement radius from a position A where an injection pipe 4 is inserted in the ground 6 before the injection pipe 4 is inserted into the ground 6. Subsequently, the injection pipe 4 is inserted into the ground 6 by lowering the pipe downward while rotating the pipe. When the injection pipe 4 reached a predetermined depth, lowering of the injection pipe 4 is stopped. A solidification material slurry is injected from a nozzle 9 while the injection pipe 4 is pulled up at a predetermined speed while the injection pipe 4 is rotated at predetermined revolution speed. An acceleration sensor 10 detects acceleration generated on the arrival pipe 5 and transfers the detection result to a recording meter 11 while the injection pipe 4 is pulled up.SELECTED DRAWING: Figure 1
【課題】高圧噴射攪拌工法において造成中の改良体の改良半径が設計改良半径に達しているか否かを改良体の造成中に確認する方法及び装置を提供する。【解決手段】注入管4を地盤6に挿入する前に、注入管4が地盤6に挿入される位置Aから、設計改良半径に相当する距離Lだけ離れた位置Bに、円筒形状を有する鉄製の管である到達管5を予め地盤6に挿入しておく。次に、注入管4を回転させながら下降させて地盤6に挿入する。注入管4を所定の深さまで挿入したら、注入管4の下降を止める。注入管4を所定回転数で回転させながら所定の速度で注入管4を引き上げると共にノズル9から固化材スラリーが噴射される。注入管4を引き上げる間、加速度センサー10は、到達管5に生じる加速度を検知し、検知結果を記録計11に伝送する。【選択図】図1
METHOD AND DEVICE FOR CHECKING IMPROVEMENT RADIUS OF IMPROVEMENT BODY
改良体の改良半径を確認する方法及び装置
ISHII TOSHIKI (author)
2017-01-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD AND DEVICE FOR CONFIRMING IMPROVEMENT RADIUS OF IMPROVEMENT BODY
European Patent Office | 2018
|OUTER EDGE CHECKING APPARATUS FOR GROUND IMPROVEMENT BODY
European Patent Office | 2018
|IMPROVEMENT BODY MEASUREMENT DEVICE AND IMPROVEMENT BODY MEASUREMENT METHOD
European Patent Office | 2020
|SOIL IMPROVEMENT BODY CONSTRUCTION METHOD, SOIL IMPROVEMENT DEVICE, SOIL IMPROVEMENT BATHOLITH
European Patent Office | 2017
|European Patent Office | 2021
|