A platform for research: civil engineering, architecture and urbanism
JOINT STRUCTURE, JOINT, AND INSTALLATION METHOD FOR JOINT STRUCTURE
PROBLEM TO BE SOLVED: To provide a joint structure, a joint, and an installation method for the joint structure that resolve a problem with grout joining.SOLUTION: A joint structure 200 connects a flange 40 of a pile head part of a pile 400 with a tower flange 50 of a bottom tower 500, with a bolt 90 and a nut 91. The joint structure includes: a first joint member 110a having a first upper flange part 30a inclined by a joint member inclination angle α to a first lower flange part 10a connected to the flange 40 of the pile head part; and a second joint member 110b having a second upper flange part 30b inclined by the joint member inclination angle α to a second lower flange part 10b connected to the first upper flange part 30a. A first thickest phase (phase A) of the first joint member 110a and a second thickest phase (phase B) of the second joint member 110b are positioned symmetrically to each other on both sides of a virtual line in a pile inclination direction.SELECTED DRAWING: Figure 4
【課題】グラウト接合における問題を解消する継手構造および継手並びに杭構造物の施工方法を提供する。【解決手段】継手構造200は、杭400の杭頭部フランジ部40とボトムタワー500のタワーフランジ50とを、ボルト90/ナット91によって接続するものであって、杭頭部フランジ部40に接続された第1下フランジ部10aに対して継手部材傾斜角度α傾斜した第1上フランジ部30aを具備する第1継手部材110aと、第1上フランジ部30aに接続された第2下フランジ部10bに対して継手部材傾斜角度α傾斜した第2上フランジ30bを具備する第2継手部材110bとを有し、第1継手部材110aの第1最厚位相(位相A)と第2継手部材110bの第2最厚位相(位相B)とは、杭傾斜方向仮想線に対して互いに対称に配置されている。【選択図】図4
JOINT STRUCTURE, JOINT, AND INSTALLATION METHOD FOR JOINT STRUCTURE
PROBLEM TO BE SOLVED: To provide a joint structure, a joint, and an installation method for the joint structure that resolve a problem with grout joining.SOLUTION: A joint structure 200 connects a flange 40 of a pile head part of a pile 400 with a tower flange 50 of a bottom tower 500, with a bolt 90 and a nut 91. The joint structure includes: a first joint member 110a having a first upper flange part 30a inclined by a joint member inclination angle α to a first lower flange part 10a connected to the flange 40 of the pile head part; and a second joint member 110b having a second upper flange part 30b inclined by the joint member inclination angle α to a second lower flange part 10b connected to the first upper flange part 30a. A first thickest phase (phase A) of the first joint member 110a and a second thickest phase (phase B) of the second joint member 110b are positioned symmetrically to each other on both sides of a virtual line in a pile inclination direction.SELECTED DRAWING: Figure 4
【課題】グラウト接合における問題を解消する継手構造および継手並びに杭構造物の施工方法を提供する。【解決手段】継手構造200は、杭400の杭頭部フランジ部40とボトムタワー500のタワーフランジ50とを、ボルト90/ナット91によって接続するものであって、杭頭部フランジ部40に接続された第1下フランジ部10aに対して継手部材傾斜角度α傾斜した第1上フランジ部30aを具備する第1継手部材110aと、第1上フランジ部30aに接続された第2下フランジ部10bに対して継手部材傾斜角度α傾斜した第2上フランジ30bを具備する第2継手部材110bとを有し、第1継手部材110aの第1最厚位相(位相A)と第2継手部材110bの第2最厚位相(位相B)とは、杭傾斜方向仮想線に対して互いに対称に配置されている。【選択図】図4
JOINT STRUCTURE, JOINT, AND INSTALLATION METHOD FOR JOINT STRUCTURE
継手構造および継手並びに杭構造物の施工方法
WATANABE AKIRA (author) / MASUI NAOKI (author) / MIWA TOSHIAKI (author) / IMASAKA TAKEHIRO (author)
2017-01-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
VERTICAL JOINT STRUCTURE, AND INSTALLATION METHOD OF VERTICAL JOINT STRUCTURE
European Patent Office | 2016
|EXPANSION JOINT INSTALLATION METHOD AND EXPANSION JOINT STRUCTURE USING THE SAME
European Patent Office | 2021
|EXPANSION JOINT INSTALLATION METHOD AND EXPANSION JOINT STRUCTURE USING THE SAME
European Patent Office | 2019
|