A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM COMPRISING THE SAME
PROBLEM TO BE SOLVED: To prevent an abend of program rewriting processing executed in a stop state of a motor.SOLUTION: A construction machine comprises: a motor 13; an alternator 14 for generating power by using motive power of the motor 13; a power storage device 15 for storing power generated by the alternator 14; control means 12 for storing a program being currently used and executing rewriting processing of rewriting the program using an update program by using power from the power storage device 15 at the time of the motor 13 being stopped; and a charge amount detection unit 18e for detecting the amount of charge of the power storage device 15. The control means 12, when the amount of charge detected by the charge amount detection unit 18e is smaller than a rewriting charge amount previously set as the amount of charge required for the rewriting processing, prohibits execution of the rewriting processing.SELECTED DRAWING: Figure 2
【課題】原動機の停止状態において実行されるプログラムの書換処理が異常終了するのを抑制する。【解決手段】建設機械は、原動機13と、原動機13の動力を用いて発電するオルタネータ14と、オルタネータ14により発電された電力を蓄える蓄電装置15と、現在利用されているプログラムを記憶するとともに、原動機13が停止している状態で蓄電装置15からの電力を用いてプログラムを更新プログラムで書き換える書換処理を実行する制御手段12と、蓄電装置15の充電量を検出する充電量検出部18eと、を備えている。制御手段12は、充電量検出部18eにより検出された充電量が書換処理に必要な充電量として予め設定された書換充電量よりも少ない場合に書換処理の実行を禁止する。【選択図】図2
CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM COMPRISING THE SAME
PROBLEM TO BE SOLVED: To prevent an abend of program rewriting processing executed in a stop state of a motor.SOLUTION: A construction machine comprises: a motor 13; an alternator 14 for generating power by using motive power of the motor 13; a power storage device 15 for storing power generated by the alternator 14; control means 12 for storing a program being currently used and executing rewriting processing of rewriting the program using an update program by using power from the power storage device 15 at the time of the motor 13 being stopped; and a charge amount detection unit 18e for detecting the amount of charge of the power storage device 15. The control means 12, when the amount of charge detected by the charge amount detection unit 18e is smaller than a rewriting charge amount previously set as the amount of charge required for the rewriting processing, prohibits execution of the rewriting processing.SELECTED DRAWING: Figure 2
【課題】原動機の停止状態において実行されるプログラムの書換処理が異常終了するのを抑制する。【解決手段】建設機械は、原動機13と、原動機13の動力を用いて発電するオルタネータ14と、オルタネータ14により発電された電力を蓄える蓄電装置15と、現在利用されているプログラムを記憶するとともに、原動機13が停止している状態で蓄電装置15からの電力を用いてプログラムを更新プログラムで書き換える書換処理を実行する制御手段12と、蓄電装置15の充電量を検出する充電量検出部18eと、を備えている。制御手段12は、充電量検出部18eにより検出された充電量が書換処理に必要な充電量として予め設定された書換充電量よりも少ない場合に書換処理の実行を禁止する。【選択図】図2
CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM COMPRISING THE SAME
建設機械及びこれを備えたプログラム書き換えシステム
IWASAKI KAZUHIRO (author) / YOSHIHARA HIDEKI (author) / YAMAZAKI YOICHIRO (author)
2017-01-19
Patent
Electronic Resource
Japanese
CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM COMPRISING THE SAME
European Patent Office | 2017
|CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM PROVIDED WITH SAME
European Patent Office | 2022
|Construction machine and program rewriting system provided with same
European Patent Office | 2021
|CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM PROVIDED WITH SAME
European Patent Office | 2017
|CONSTRUCTION MACHINE AND PROGRAM REWRITING SYSTEM PROVIDED WITH SAME
European Patent Office | 2018
|