A platform for research: civil engineering, architecture and urbanism
OUTER WALL MATERIAL CONSTRUCTION TOOL AND OUTER WALL MATERIAL CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an outer wall material construction tool with which an outer wall material can be easily constructed and an outer wall material construction method using the same.SOLUTION: Provided is a tool 1 used when clinker-plating an outer wall material 3. The tool 1 comprises an upper engagement part 13 and a supporting part 21. The upper engagement part 13 is engaged with the upper end surface 30 of the lower step outer wall material 3B which is arranged on a wall substrate 5, and, under this condition, the supporting part 21 supports the lower end surface 33 of the upper step outer wall material 3A which is arranged above higher than the lower step outer wall material 3B by one step. Thus, the upper step outer wall material 3A is arranged at the same height as the planned construction place.SELECTED DRAWING: Figure 3
【課題】外壁材を容易に施工できる外壁材施工用治具およびこれを用いた外壁材の施工方法を提供する。【解決手段】外壁材3を鎧張りする際に使用される治具1である。治具1は、上係止部13と支持部21とを備える。上係止部13は、壁下地5に施工された下段外壁材3Bの上端面30に係止され、この状態において、支持部21が下段外壁材3Bよりも一段上に施工される上段外壁材3Aの下端面33を支持する。これにより、上段外壁材3が施工予定箇所と同じ高さに配置される。【選択図】図3
OUTER WALL MATERIAL CONSTRUCTION TOOL AND OUTER WALL MATERIAL CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an outer wall material construction tool with which an outer wall material can be easily constructed and an outer wall material construction method using the same.SOLUTION: Provided is a tool 1 used when clinker-plating an outer wall material 3. The tool 1 comprises an upper engagement part 13 and a supporting part 21. The upper engagement part 13 is engaged with the upper end surface 30 of the lower step outer wall material 3B which is arranged on a wall substrate 5, and, under this condition, the supporting part 21 supports the lower end surface 33 of the upper step outer wall material 3A which is arranged above higher than the lower step outer wall material 3B by one step. Thus, the upper step outer wall material 3A is arranged at the same height as the planned construction place.SELECTED DRAWING: Figure 3
【課題】外壁材を容易に施工できる外壁材施工用治具およびこれを用いた外壁材の施工方法を提供する。【解決手段】外壁材3を鎧張りする際に使用される治具1である。治具1は、上係止部13と支持部21とを備える。上係止部13は、壁下地5に施工された下段外壁材3Bの上端面30に係止され、この状態において、支持部21が下段外壁材3Bよりも一段上に施工される上段外壁材3Aの下端面33を支持する。これにより、上段外壁材3が施工予定箇所と同じ高さに配置される。【選択図】図3
OUTER WALL MATERIAL CONSTRUCTION TOOL AND OUTER WALL MATERIAL CONSTRUCTION METHOD
外壁材施工用治具および外壁材の施工方法
MORI SHUICHI (author) / OSAKAKI HIROSHI (author)
2017-01-19
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
European Patent Office | 2018
|Outer wall construction robot and outer wall construction system
European Patent Office | 2023
|