PRECAST PILE CONNECTION STATE RECORDING METHOD AND PRECAST PILE CONNECTION STATE CONFIRMATION METHOD
PROBLEM TO BE SOLVED: To provide a precast pile connection state recording/confirmation method for allowing confirmation as to whether precast piles of designated specifications have been connected with each other, easily and properly after construction.SOLUTION: The method includes: a first code generation process of generating a first code corresponding to basic data on specifications of a first pile; a second code generation process of generating a second code corresponding to basic data on a second pile; a first code adding process of adding the first code on an outer peripheral surface of an end part of the first pile; a second code adding process of adding the second code on an outer peripheral surface of an end part of the second pile; a lower pile installation process of installing the first pile; an upper pile connection process of positioning an upper end of the first pile and a lower end of the second pile such that the first code and the second code are included in one visual field and connecting the piles together; an imaging process of capturing an image of the end of the first pile and the end of the second pile with the first code and the second code included in the image; and a process of storing image data obtained in the imaging process on a storage device.SELECTED DRAWING: Figure 1
【課題】指定された仕様の既製杭同士が連結されたか否かを事後的に容易且つ的確に確認可能することを可能にする既製杭連結状態記録確認方法を提供する。【解決手段】第1杭の仕様に関する基本データに対応する第1符号を作成する第1符号作成工程と、第2杭の仕様に関する基本データに対応する第2符号を作成する第2符号作成工程と、前記第1符号を前記第1杭の端部の外周面に付与する第1符号付与工程と、前記第2符号を前記第2杭の端部の外周面に付与する第2符号付与工程と、前記第1杭を沈設する下杭沈設工程と、前記第1杭の上端部と前記第2杭の下端部を、前記第1符号及び前記第2符号が1つの視野内に収まるように位置決めして相互に連結する上杭連結工程と、前記第1符号及び前記第2符号が含まれるように、前記第1杭の端部及び前記第2杭の端部を撮影する撮影工程と、前記撮影工程によって得られた画像データを記憶装置に格納する工程とを備える。【選択図】図1
PRECAST PILE CONNECTION STATE RECORDING METHOD AND PRECAST PILE CONNECTION STATE CONFIRMATION METHOD
PROBLEM TO BE SOLVED: To provide a precast pile connection state recording/confirmation method for allowing confirmation as to whether precast piles of designated specifications have been connected with each other, easily and properly after construction.SOLUTION: The method includes: a first code generation process of generating a first code corresponding to basic data on specifications of a first pile; a second code generation process of generating a second code corresponding to basic data on a second pile; a first code adding process of adding the first code on an outer peripheral surface of an end part of the first pile; a second code adding process of adding the second code on an outer peripheral surface of an end part of the second pile; a lower pile installation process of installing the first pile; an upper pile connection process of positioning an upper end of the first pile and a lower end of the second pile such that the first code and the second code are included in one visual field and connecting the piles together; an imaging process of capturing an image of the end of the first pile and the end of the second pile with the first code and the second code included in the image; and a process of storing image data obtained in the imaging process on a storage device.SELECTED DRAWING: Figure 1
【課題】指定された仕様の既製杭同士が連結されたか否かを事後的に容易且つ的確に確認可能することを可能にする既製杭連結状態記録確認方法を提供する。【解決手段】第1杭の仕様に関する基本データに対応する第1符号を作成する第1符号作成工程と、第2杭の仕様に関する基本データに対応する第2符号を作成する第2符号作成工程と、前記第1符号を前記第1杭の端部の外周面に付与する第1符号付与工程と、前記第2符号を前記第2杭の端部の外周面に付与する第2符号付与工程と、前記第1杭を沈設する下杭沈設工程と、前記第1杭の上端部と前記第2杭の下端部を、前記第1符号及び前記第2符号が1つの視野内に収まるように位置決めして相互に連結する上杭連結工程と、前記第1符号及び前記第2符号が含まれるように、前記第1杭の端部及び前記第2杭の端部を撮影する撮影工程と、前記撮影工程によって得られた画像データを記憶装置に格納する工程とを備える。【選択図】図1
PRECAST PILE CONNECTION STATE RECORDING METHOD AND PRECAST PILE CONNECTION STATE CONFIRMATION METHOD
既製杭連結状態記録方法、及び、既製杭連結状態確認方法
SHIMIZU HIROAKI (author)
2017-01-26
Patent
Electronic Resource
Japanese
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
G05B
Steuer- oder Regelsysteme allgemein
,
CONTROL OR REGULATING SYSTEMS IN GENERAL
Mechanical connection precast pile, precast pile production mold and production process thereof
European Patent Office | 2024
|Connection method of concrete precast pile and pile foundation cap
European Patent Office | 2015
|