A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a disaster prevention warehouse which can supply electric power to a load for a long time at a power failure.SOLUTION: The disaster prevention warehouse includes: a building body having a specific load 22; a first power generation unit 40 having power storage capability and capable of supplying power to the specific load 22; a second power generation unit 50 having electric generation capability and capable of supplying power to the specific load 22; and a first automatic switch board 60 inserted in distribution lines L5, L7-L10, to select, as a power source for supplying power to the specific load 22, the first power generation unit 40 or the second power generation unit 50. When the second power generation unit 50 generates electricity at a power failure, the first automatic switch board 60 selects the second power generation unit 50 to supply power to the specific load 22, whereas when the second power generation unit 50 does not generate electricity at the power failure, the first power generation unit 40 is selected to supply power to the specific load 22.SELECTED DRAWING: Figure 5
【課題】停電時に負荷へ長期間電力を供給することができる防災倉庫を提供する。【解決手段】特定負荷22を有する建物本体と、蓄電能力を有し、特定負荷22へと電力を供給可能な第一の発電ユニット40と、発電能力を有し、特定負荷22へと電力を供給可能な第二の発電ユニット50と、配電線L5・L7〜L10に介挿され、特定負荷22への給電元を第一の発電ユニット40又は第二の発電ユニット50に切り替える第一の自動切替盤60と、を具備し、第一の自動切替盤60は、停電時に第二の発電ユニット50が発電していると特定負荷22への給電元を第二の発電ユニット50に切り替えると共に、停電時に第二の発電ユニット50が発電していないと特定負荷22への給電元を第一の発電ユニット40に切り替えるものである。【選択図】図5
PROBLEM TO BE SOLVED: To provide a disaster prevention warehouse which can supply electric power to a load for a long time at a power failure.SOLUTION: The disaster prevention warehouse includes: a building body having a specific load 22; a first power generation unit 40 having power storage capability and capable of supplying power to the specific load 22; a second power generation unit 50 having electric generation capability and capable of supplying power to the specific load 22; and a first automatic switch board 60 inserted in distribution lines L5, L7-L10, to select, as a power source for supplying power to the specific load 22, the first power generation unit 40 or the second power generation unit 50. When the second power generation unit 50 generates electricity at a power failure, the first automatic switch board 60 selects the second power generation unit 50 to supply power to the specific load 22, whereas when the second power generation unit 50 does not generate electricity at the power failure, the first power generation unit 40 is selected to supply power to the specific load 22.SELECTED DRAWING: Figure 5
【課題】停電時に負荷へ長期間電力を供給することができる防災倉庫を提供する。【解決手段】特定負荷22を有する建物本体と、蓄電能力を有し、特定負荷22へと電力を供給可能な第一の発電ユニット40と、発電能力を有し、特定負荷22へと電力を供給可能な第二の発電ユニット50と、配電線L5・L7〜L10に介挿され、特定負荷22への給電元を第一の発電ユニット40又は第二の発電ユニット50に切り替える第一の自動切替盤60と、を具備し、第一の自動切替盤60は、停電時に第二の発電ユニット50が発電していると特定負荷22への給電元を第二の発電ユニット50に切り替えると共に、停電時に第二の発電ユニット50が発電していないと特定負荷22への給電元を第一の発電ユニット40に切り替えるものである。【選択図】図5
DISASTER PREVENTION WAREHOUSE
防災倉庫
HARADA MASAHIRO (author)
2017-02-16
Patent
Electronic Resource
Japanese
IPC:
H02J
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER
,
Schaltungsanordnungen oder Systeme für die Abgabe oder Verteilung elektrischer Leistung
/
B65G
TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
,
Transport- oder Lagervorrichtungen, z.B. Förderer zum Laden oder Abladen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2021
|EMERGENCY SUPPLY STORAGE WAREHOUSE AND DISASTER PREVENTION SYSTEM INCLUDING THE SAME
European Patent Office | 2016
|