MOVEMENT METHOD OF WORK FLOOR IN VERTICAL SHAFT OR INCLINED SHAFT AND LINING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a movement method of a work floor in a vertical shaft or an inclined shaft excellent in workability, and a lining construction method of the vertical shaft or the inclined shaft.SOLUTION: A backfilling material 27 is filled inside a vertical shaft 17. The backfilling material 27 is filled up to the vicinity of a ground 1 in the vertical shaft 17. An upper surface of the backfilling material 27 functions as a work floor 25. A part above the backfilling material 27 is excavated, and the excavated backfilling material 27 is inputted from the upper end of a pipe 19. The backfilling material 27 inputted to the pipe 19 is sent out to a lower space 3 via the pipe 19. Thus, the backfilling material 27 is excavated above and is sent out downward via the pipe 19, so that an upper surface position of the backfilling material 27 is moved downward by quantity of the excavated backfilling material 27. That is, the work floor 25 moves downward.SELECTED DRAWING: Figure 4
【課題】作業性に優れた立坑または斜坑における作業床の移動方法、および立坑または斜坑のライニング施工方法を提供する。【解決手段】立坑17の内部に、埋め戻し材27が充填される。埋め戻し材27は、立坑17内の地盤1近傍まで充填される。埋め戻し材27の上面は、作業床25として機能する。埋め戻し材27の上方の一部を掘削し、掘削した埋め戻し材27をパイプ19の上端から投入する。パイプ19に投入された埋め戻し材27は、パイプ19を通じて下方空間3へ送り出される。このように、埋め戻し材27が上方で掘削されて、パイプ19を通じて下方に送り出されるため、掘削した埋め戻し材27分だけ、埋め戻し材27の上面位置が下方へ移動する。すなわち、作業床25が下方へ移動する。【選択図】図4
MOVEMENT METHOD OF WORK FLOOR IN VERTICAL SHAFT OR INCLINED SHAFT AND LINING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a movement method of a work floor in a vertical shaft or an inclined shaft excellent in workability, and a lining construction method of the vertical shaft or the inclined shaft.SOLUTION: A backfilling material 27 is filled inside a vertical shaft 17. The backfilling material 27 is filled up to the vicinity of a ground 1 in the vertical shaft 17. An upper surface of the backfilling material 27 functions as a work floor 25. A part above the backfilling material 27 is excavated, and the excavated backfilling material 27 is inputted from the upper end of a pipe 19. The backfilling material 27 inputted to the pipe 19 is sent out to a lower space 3 via the pipe 19. Thus, the backfilling material 27 is excavated above and is sent out downward via the pipe 19, so that an upper surface position of the backfilling material 27 is moved downward by quantity of the excavated backfilling material 27. That is, the work floor 25 moves downward.SELECTED DRAWING: Figure 4
【課題】作業性に優れた立坑または斜坑における作業床の移動方法、および立坑または斜坑のライニング施工方法を提供する。【解決手段】立坑17の内部に、埋め戻し材27が充填される。埋め戻し材27は、立坑17内の地盤1近傍まで充填される。埋め戻し材27の上面は、作業床25として機能する。埋め戻し材27の上方の一部を掘削し、掘削した埋め戻し材27をパイプ19の上端から投入する。パイプ19に投入された埋め戻し材27は、パイプ19を通じて下方空間3へ送り出される。このように、埋め戻し材27が上方で掘削されて、パイプ19を通じて下方に送り出されるため、掘削した埋め戻し材27分だけ、埋め戻し材27の上面位置が下方へ移動する。すなわち、作業床25が下方へ移動する。【選択図】図4
MOVEMENT METHOD OF WORK FLOOR IN VERTICAL SHAFT OR INCLINED SHAFT AND LINING CONSTRUCTION METHOD
立坑または斜坑における作業床の移動方法、およびライニング施工方法
MATSUKAWA HISATOSHI (author) / HASUI MAKOTO (author) / FUJII HIROSHI (author) / MEGA TAKASHI (author) / FUJIWARA KOICHI (author)
2017-03-02
Patent
Electronic Resource
Japanese
Method of lining down an inclined shaft
Engineering Index Backfile | 1945
|Method of lining down an inclined shaft
Engineering Index Backfile | 1944
|Construction method for inclined frame foundation of vertical shaft
European Patent Office | 2024
|