A platform for research: civil engineering, architecture and urbanism
JOINT STRUCTURE AND JOINING METHOD
PROBLEM TO BE SOLVED: To provide a joint structure of precast blocks capable of simply forming the joint structure and ensuring redundancy of the joint structure.SOLUTION: Multiple reinforcements 12 are buried in precast blocks 1, 1'. The blocks 1, 1' have grooves 11a, 11b, which open on two surfaces that are an end face in a height direction and a side face continuing to the end face, and the grooves 11a, 11b are different in length on the side faces. The reinforcement 12 is disposed along the grooves 11a, 11b, respectively. When the end faces of the blocks 1, 1' are made to face each other, the position of a longer groove 11a of the block 1 corresponds to that of a shorter groove 11b of the block 1' and the position of a shorter groove 11b of the block 1 corresponds to the longer groove 11a of the block 1'. Thus, a joint structure is formed by disposing a joint reinforcement 20 so as to stride over the grooves 11a, 11b located at the corresponding positions and charging a filler in the grooves 11a, 11b.SELECTED DRAWING: Figure 6
【課題】簡易に接合構造が形成でき、且つ接合構造の冗長性を確保できるプレキャストブロックの接合構造等を提供する。【解決手段】プレキャストブロック1、1’には複数の鉄筋12が埋設される。ブロック1、1’は、高さ方向の端面と、端面に続く側面の2面に開口する溝11a、11bを有し、溝11a、11bは側面における長さが異なる。鉄筋12は各溝11a、11bに沿って配置される。ブロック1、1’の端面同士を対向させるとブロック1の長い方の溝11aとブロック1’の短い方の溝11bの位置が対応し、ブロック1の短い方の溝11bとブロック1’の長い方の溝11aの位置が対応するので、これら対応する位置にある溝11a、11bを跨ぐように継手用鉄筋20を配置して溝11a、11b内に充填材を充填することで接合構造が形成される。【選択図】図6
JOINT STRUCTURE AND JOINING METHOD
PROBLEM TO BE SOLVED: To provide a joint structure of precast blocks capable of simply forming the joint structure and ensuring redundancy of the joint structure.SOLUTION: Multiple reinforcements 12 are buried in precast blocks 1, 1'. The blocks 1, 1' have grooves 11a, 11b, which open on two surfaces that are an end face in a height direction and a side face continuing to the end face, and the grooves 11a, 11b are different in length on the side faces. The reinforcement 12 is disposed along the grooves 11a, 11b, respectively. When the end faces of the blocks 1, 1' are made to face each other, the position of a longer groove 11a of the block 1 corresponds to that of a shorter groove 11b of the block 1' and the position of a shorter groove 11b of the block 1 corresponds to the longer groove 11a of the block 1'. Thus, a joint structure is formed by disposing a joint reinforcement 20 so as to stride over the grooves 11a, 11b located at the corresponding positions and charging a filler in the grooves 11a, 11b.SELECTED DRAWING: Figure 6
【課題】簡易に接合構造が形成でき、且つ接合構造の冗長性を確保できるプレキャストブロックの接合構造等を提供する。【解決手段】プレキャストブロック1、1’には複数の鉄筋12が埋設される。ブロック1、1’は、高さ方向の端面と、端面に続く側面の2面に開口する溝11a、11bを有し、溝11a、11bは側面における長さが異なる。鉄筋12は各溝11a、11bに沿って配置される。ブロック1、1’の端面同士を対向させるとブロック1の長い方の溝11aとブロック1’の短い方の溝11bの位置が対応し、ブロック1の短い方の溝11bとブロック1’の長い方の溝11aの位置が対応するので、これら対応する位置にある溝11a、11bを跨ぐように継手用鉄筋20を配置して溝11a、11b内に充填材を充填することで接合構造が形成される。【選択図】図6
JOINT STRUCTURE AND JOINING METHOD
接合構造および接合方法
SOGABE NAOKI (author) / SAKATA NOBORU (author) / YOKOZEKI KOSUKE (author) / YOKOO ATSUSHI (author)
2017-04-06
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
MEMBER JOINING METHOD, MEMBER JOINING STRUCTURE, AND JOINT MEMBER
European Patent Office | 2019
|