BEAM JOINT STRUCTURE AND BEAM JOINING METHOD
PROBLEM TO BE SOLVED: To provide a beam joint structure that enables time and cost for carrying out welding to be reduced.SOLUTION: A beam joint structure 1 is provided with: a girder 10 having a web 11 and a pair of flanges provided to both ends of the web 11; a beam 20; a gasset plate 30 that joins the girder 10 and the beam 20, in which the gasset plate 30 is provided with a first fixed part 31 welded to the girder 10, and a second fixed part 32 fixed to the beam 20 via a bolt, the first fixed part 31 is welded to the pair of flanges via a flange welding part 50, and welded to the web 11 via a web welding part 40, and the web welding part 40 includes an upper welding part 41 which welds one end of the web 11 to the first fixed part 31, and a lower welding part 42 which is formed away from the upper welding part 41 and fixes the other end of the web 11 to the first fixed part 31.SELECTED DRAWING: Figure 2
【課題】溶接の施工のための時間やコストの削減を図ることが可能な梁接合構造を提供する。【解決手段】ウェブ11及び前記ウェブ11の両端に設けられた一対のフランジを有する大梁10と、小梁20と、前記大梁10と前記小梁20とを接合するガセットプレート30と、を具備する梁接合構造1であって、前記ガセットプレート30は、前記大梁10に対して溶接される第一固定部31及び前記小梁20に対してボルトを介して固定される第二固定部32を具備し、前記第一固定部31は、フランジ溶接部50を介して前記一対のフランジにそれぞれ溶接されるとともに、ウェブ溶接部40を介して前記ウェブ11に溶接され、前記ウェブ溶接部40は、前記ウェブ11の一端部と前記第一固定部31とを固定する上部溶接部41、及び前記上部溶接部41と離間して形成され、前記ウェブ11の他端と前記第一固定部31とを固定する下部溶接部42を含む。【選択図】図2
BEAM JOINT STRUCTURE AND BEAM JOINING METHOD
PROBLEM TO BE SOLVED: To provide a beam joint structure that enables time and cost for carrying out welding to be reduced.SOLUTION: A beam joint structure 1 is provided with: a girder 10 having a web 11 and a pair of flanges provided to both ends of the web 11; a beam 20; a gasset plate 30 that joins the girder 10 and the beam 20, in which the gasset plate 30 is provided with a first fixed part 31 welded to the girder 10, and a second fixed part 32 fixed to the beam 20 via a bolt, the first fixed part 31 is welded to the pair of flanges via a flange welding part 50, and welded to the web 11 via a web welding part 40, and the web welding part 40 includes an upper welding part 41 which welds one end of the web 11 to the first fixed part 31, and a lower welding part 42 which is formed away from the upper welding part 41 and fixes the other end of the web 11 to the first fixed part 31.SELECTED DRAWING: Figure 2
【課題】溶接の施工のための時間やコストの削減を図ることが可能な梁接合構造を提供する。【解決手段】ウェブ11及び前記ウェブ11の両端に設けられた一対のフランジを有する大梁10と、小梁20と、前記大梁10と前記小梁20とを接合するガセットプレート30と、を具備する梁接合構造1であって、前記ガセットプレート30は、前記大梁10に対して溶接される第一固定部31及び前記小梁20に対してボルトを介して固定される第二固定部32を具備し、前記第一固定部31は、フランジ溶接部50を介して前記一対のフランジにそれぞれ溶接されるとともに、ウェブ溶接部40を介して前記ウェブ11に溶接され、前記ウェブ溶接部40は、前記ウェブ11の一端部と前記第一固定部31とを固定する上部溶接部41、及び前記上部溶接部41と離間して形成され、前記ウェブ11の他端と前記第一固定部31とを固定する下部溶接部42を含む。【選択図】図2
BEAM JOINT STRUCTURE AND BEAM JOINING METHOD
梁接合構造及び梁接合方法
YOSHIDA FUMIHISA (author) / NISHI TAKUMA (author) / SO BYO (author)
2018-07-05
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
COLUMN-BEAM JOINT STRUCTURE, AND METHOD OF JOINING COLUMN AND BEAM
European Patent Office | 2020
|BEAM JOINING METHOD, BEAM JOINING STRUCTURE, AND SUPPORT MEMBER
European Patent Office | 2019
|COLUMN BEAM JOINING STRUCTURE AND COLUMN BEAM JOINING METHOD
European Patent Office | 2017
|COLUMN BEAM JOINING STRUCTURE AND COLUMN BEAM JOINING METHOD
European Patent Office | 2017
|