A platform for research: civil engineering, architecture and urbanism
CONNECTION MEMBER AND STEEL SHEET PILE WALL
PROBLEM TO BE SOLVED: To provide a connection member and a steel sheet pile wall for improving impervious performance in the steel sheet pile wall, by connecting a plurality of steel sheet piles by sandwiching a joint part of the steel sheet pile by a projection part of a connection member.SOLUTION: A connection member 1 of applying the present invention comprises a plurality of fitting parts 3 for constructing a steel sheet pile wall by connecting a plurality of steel sheet piles 2 and fitting a joint part 20 of the steel sheet piles 2, a connection part 4 for connecting the plurality of fitting parts 3 and a projection part 5 extending in the normal line direction X by continuing from the connection part 4. The projection part 5 is separately formed in the normal line orthogonal direction Y from the fitting parts 3, so as to sandwich the joint part 20 of the steel sheet pile 2 fitted to the fitting part 3 in the normal line orthogonal direction Y.SELECTED DRAWING: Figure 4
【課題】鋼矢板の継手部を連結部材の突出部で挟み込んで複数の鋼矢板を連結することで、鋼矢板壁の遮水性能を向上させた連結部材及び鋼矢板壁を提供する。【解決手段】本発明を適用した連結部材1は、複数の鋼矢板2を連結して鋼矢板壁を構築するためのものであり、鋼矢板2の継手部20が嵌合される複数の嵌合部3と、複数の嵌合部3が接続される接続部4と、接続部4から連続して法線方向Xに延びる突出部5とを備える。突出部5は、嵌合部3から法線直交方向Yに離間して形成されることで、嵌合部3に嵌合された鋼矢板2の継手部20を法線直交方向Yに挟み込むものとなる。【選択図】図4
CONNECTION MEMBER AND STEEL SHEET PILE WALL
PROBLEM TO BE SOLVED: To provide a connection member and a steel sheet pile wall for improving impervious performance in the steel sheet pile wall, by connecting a plurality of steel sheet piles by sandwiching a joint part of the steel sheet pile by a projection part of a connection member.SOLUTION: A connection member 1 of applying the present invention comprises a plurality of fitting parts 3 for constructing a steel sheet pile wall by connecting a plurality of steel sheet piles 2 and fitting a joint part 20 of the steel sheet piles 2, a connection part 4 for connecting the plurality of fitting parts 3 and a projection part 5 extending in the normal line direction X by continuing from the connection part 4. The projection part 5 is separately formed in the normal line orthogonal direction Y from the fitting parts 3, so as to sandwich the joint part 20 of the steel sheet pile 2 fitted to the fitting part 3 in the normal line orthogonal direction Y.SELECTED DRAWING: Figure 4
【課題】鋼矢板の継手部を連結部材の突出部で挟み込んで複数の鋼矢板を連結することで、鋼矢板壁の遮水性能を向上させた連結部材及び鋼矢板壁を提供する。【解決手段】本発明を適用した連結部材1は、複数の鋼矢板2を連結して鋼矢板壁を構築するためのものであり、鋼矢板2の継手部20が嵌合される複数の嵌合部3と、複数の嵌合部3が接続される接続部4と、接続部4から連続して法線方向Xに延びる突出部5とを備える。突出部5は、嵌合部3から法線直交方向Yに離間して形成されることで、嵌合部3に嵌合された鋼矢板2の継手部20を法線直交方向Yに挟み込むものとなる。【選択図】図4
CONNECTION MEMBER AND STEEL SHEET PILE WALL
連結部材及び鋼矢板壁
NAGAO NAOYA (author) / HARADA NORIYOSHI (author) / KATSURA TAKUZO (author)
2017-05-25
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|VERTICAL CONNECTION STRUCTURE OF STEEL SHEET PIPE AND STEEL SHEET PILE WALL
European Patent Office | 2017
|