A platform for research: civil engineering, architecture and urbanism
BLIND CONTROLLER, BLIND CONTROL METHOD, COMPUTER PROGRAM, AND BLIND CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a blind controller, blind control method, computer program, and blind control system, capable of more accurately controlling opening/closing of a blind.SOLUTION: A blind controller of an embodiment includes an individual control section and a control instruction section. The individual control section controls blind devices provided at a building by the first unit number. The control instruction section, on the basis of shadow information showing a radiation situation of direct sunlight on the building, instructs either the individual control section or a group controller for controlling blind devices by the second unit number larger than the first unit number to control the blind devices. The control instruction section instructs either the individual control section or the group controller to control the blind devices, so that operation of the blind devices starts at second timing going back by a required time necessary for the operation of the blind devices from a first timing at which a variation in the radiation situation is predicted.SELECTED DRAWING: Figure 3
【課題】ブラインドの開閉をより精度良く制御することができるブラインド制御装置、ブラインド制御方法、コンピュータプログラム及びブラインド制御システムを提供することである。【解決手段】実施形態のブラインド制御装置は、個別制御部と、制御指示部と、を持つ。個別制御部は、建物に備えられたブラインド装置を、第1の単位数ごとに制御する。制御指示部は、建物に対する直射日光の照射状況を示す影情報に基づいて、ブラインド装置の制御を、個別制御部と、ブラインド装置を第1の単位数よりも大きな第2の単位数ごとに制御するグループ制御装置と、のいずれかに指示する。制御指示部は、照射状況の変化が予測される第1のタイミングからブラインド装置の動作に必要な所要時間だけ遡った第2のタイミングにおいてブラインド装置の動作が開始されるように、個別制御部又はグループ制御装置に対してブラインド装置の制御を指示する。【選択図】図3
BLIND CONTROLLER, BLIND CONTROL METHOD, COMPUTER PROGRAM, AND BLIND CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a blind controller, blind control method, computer program, and blind control system, capable of more accurately controlling opening/closing of a blind.SOLUTION: A blind controller of an embodiment includes an individual control section and a control instruction section. The individual control section controls blind devices provided at a building by the first unit number. The control instruction section, on the basis of shadow information showing a radiation situation of direct sunlight on the building, instructs either the individual control section or a group controller for controlling blind devices by the second unit number larger than the first unit number to control the blind devices. The control instruction section instructs either the individual control section or the group controller to control the blind devices, so that operation of the blind devices starts at second timing going back by a required time necessary for the operation of the blind devices from a first timing at which a variation in the radiation situation is predicted.SELECTED DRAWING: Figure 3
【課題】ブラインドの開閉をより精度良く制御することができるブラインド制御装置、ブラインド制御方法、コンピュータプログラム及びブラインド制御システムを提供することである。【解決手段】実施形態のブラインド制御装置は、個別制御部と、制御指示部と、を持つ。個別制御部は、建物に備えられたブラインド装置を、第1の単位数ごとに制御する。制御指示部は、建物に対する直射日光の照射状況を示す影情報に基づいて、ブラインド装置の制御を、個別制御部と、ブラインド装置を第1の単位数よりも大きな第2の単位数ごとに制御するグループ制御装置と、のいずれかに指示する。制御指示部は、照射状況の変化が予測される第1のタイミングからブラインド装置の動作に必要な所要時間だけ遡った第2のタイミングにおいてブラインド装置の動作が開始されるように、個別制御部又はグループ制御装置に対してブラインド装置の制御を指示する。【選択図】図3
BLIND CONTROLLER, BLIND CONTROL METHOD, COMPUTER PROGRAM, AND BLIND CONTROL SYSTEM
ブラインド制御装置、ブラインド制御方法、コンピュータプログラム及びブラインド制御システム
WAKABAYASHI YASUHIDE (author)
2017-06-01
Patent
Electronic Resource
Japanese
IPC:
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
BLIND CONTROLLER, BLIND CONTROL SYSTEM, AND BLIND CONTROL METHOD
European Patent Office | 2016
|BLIND CONTROLLER, BLIND CONTROL SYSTEM, AND BLIND CONTROL METHOD
European Patent Office | 2015
|BLIND CONTROL SYSTEM, BLIND CONTROL DEVICE, BLIND CONTROL METHOD AND PROGRAM
European Patent Office | 2021
|