PROBLEM TO BE SOLVED: To obtain an inner wall structure of a building in which additional inner wall materials can be mounted in a coupling part between one building unit and the other building unit on site by a simple configuration.SOLUTION: An additional vertical crossbar 126 is arranged and mounted along a vertical crossbar 152 in a vertical crossbar 156 side of the vertical crossbar 152, and an additional vertical crossbar 158 is mounted along the vertical crossbar 156 in the vertical crossbar 152 side of the vertical crossbar 156. Accordingly, in a boundary between a portion of a building unit 14 side in an inner wall 100 and a portion of a building unit 16 side in the inner wall 100, a mounting allowance along a building height direction is secured in each of the building unit 14 side and the building unit 16 side. As a result, most of the inner wall 100 are mounted to the building units 14, 16 in a factory, and additional inner wall materials 128 crossing over a coupling part 140 can be mounted on site in this mounting allowance.SELECTED DRAWING: Figure 1
【課題】簡易な構成によって、現地で一方の建物ユニットと他方の建物ユニットとの連結部に追加内壁材を取り付けることができる建物の内壁構造を得る。【解決手段】縦桟152の縦桟156側に当該縦桟152に沿って追加縦桟126が配置取り付けられると共に、縦桟156の縦桟152側に当該縦桟156に沿って追加縦桟158が取り付けられている。このため、内壁100における建物ユニット14側の部分と当該内壁100における建物ユニット16側の部分との境界部には、建物ユニット14側と建物ユニット16側とのそれぞれに建物高さ方向に沿う取付代が確保される。その結果、工場内で建物ユニット14、16に内壁100の大部分を取り付け、この取付代に連結部140に跨る追加内壁材128を現地で取り付けることが可能となる。【選択図】図1
PROBLEM TO BE SOLVED: To obtain an inner wall structure of a building in which additional inner wall materials can be mounted in a coupling part between one building unit and the other building unit on site by a simple configuration.SOLUTION: An additional vertical crossbar 126 is arranged and mounted along a vertical crossbar 152 in a vertical crossbar 156 side of the vertical crossbar 152, and an additional vertical crossbar 158 is mounted along the vertical crossbar 156 in the vertical crossbar 152 side of the vertical crossbar 156. Accordingly, in a boundary between a portion of a building unit 14 side in an inner wall 100 and a portion of a building unit 16 side in the inner wall 100, a mounting allowance along a building height direction is secured in each of the building unit 14 side and the building unit 16 side. As a result, most of the inner wall 100 are mounted to the building units 14, 16 in a factory, and additional inner wall materials 128 crossing over a coupling part 140 can be mounted on site in this mounting allowance.SELECTED DRAWING: Figure 1
【課題】簡易な構成によって、現地で一方の建物ユニットと他方の建物ユニットとの連結部に追加内壁材を取り付けることができる建物の内壁構造を得る。【解決手段】縦桟152の縦桟156側に当該縦桟152に沿って追加縦桟126が配置取り付けられると共に、縦桟156の縦桟152側に当該縦桟156に沿って追加縦桟158が取り付けられている。このため、内壁100における建物ユニット14側の部分と当該内壁100における建物ユニット16側の部分との境界部には、建物ユニット14側と建物ユニット16側とのそれぞれに建物高さ方向に沿う取付代が確保される。その結果、工場内で建物ユニット14、16に内壁100の大部分を取り付け、この取付代に連結部140に跨る追加内壁材128を現地で取り付けることが可能となる。【選択図】図1
INNER WALL STRUCTURE OF BUILDING
建物の内壁構造
KANEKO SHOTA (author)
2017-06-08
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method of inner wall of eco-friendly building and inner wall structure thereof