CONSTRUCTION METHOD OF FREEZING PIPE
PROBLEM TO BE SOLVED: To provide a construction method of a freezing pipe capable of preventing the inflow-outflow of a pollutant to the inside-outside of an underground structure.SOLUTION: A first casing 3a is installed up to a bottom slab 1a being a concrete slab of an underground structure 1. In this case, the tip of the casing 3a is inserted up to the middle of a thickness of the bottom slab 1a. For example, the tip of the casing 3a is inserted into the bottom slab 1a up to this side of a part for arranging a reinforcement of the bottom slab 1a. Next, a water cutoff material 5 is filled by a predetermined quantity on the inside of the casing 3a. After solidifying the water cutoff material 5, a second casing 3b is inserted into the inside of the casing 3a. Excavation is executed up to under an underground structure 1 by penetrating the bottom slab 1a together with the water cutoff material 5 inside of the casing 3a by a casing 3b. For example, the excavation is executed up to an underground impermeable water layer by the casing 3b.SELECTED DRAWING: Figure 1
【課題】地中構造物の内外への汚染物質の流入出を防止することが可能な凍結管の施工方法を提供する。【解決手段】地中構造物1のコンクリート版である底版1aまで第1のケーシング3aを設置する。この際、ケーシング3aの先端を、底版1aの厚みの途中まで挿入する。例えば、底版1aの鉄筋が配置される部位の手前までケーシング3aの先端を底版1aに挿入する。次に、ケーシング3aの内部に、止水材5を所定量充填する。止水材5が固化したのち、ケーシング3aの内部に第2のケーシング3bを挿入する。ケーシング3bによって、ケーシング3aの内部の止水材5とともに底版1aを貫通させて地中構造物1の下方まで掘削する。例えば、ケーシング3bによって、地下の不透水層まで掘削する。【選択図】図1
CONSTRUCTION METHOD OF FREEZING PIPE
PROBLEM TO BE SOLVED: To provide a construction method of a freezing pipe capable of preventing the inflow-outflow of a pollutant to the inside-outside of an underground structure.SOLUTION: A first casing 3a is installed up to a bottom slab 1a being a concrete slab of an underground structure 1. In this case, the tip of the casing 3a is inserted up to the middle of a thickness of the bottom slab 1a. For example, the tip of the casing 3a is inserted into the bottom slab 1a up to this side of a part for arranging a reinforcement of the bottom slab 1a. Next, a water cutoff material 5 is filled by a predetermined quantity on the inside of the casing 3a. After solidifying the water cutoff material 5, a second casing 3b is inserted into the inside of the casing 3a. Excavation is executed up to under an underground structure 1 by penetrating the bottom slab 1a together with the water cutoff material 5 inside of the casing 3a by a casing 3b. For example, the excavation is executed up to an underground impermeable water layer by the casing 3b.SELECTED DRAWING: Figure 1
【課題】地中構造物の内外への汚染物質の流入出を防止することが可能な凍結管の施工方法を提供する。【解決手段】地中構造物1のコンクリート版である底版1aまで第1のケーシング3aを設置する。この際、ケーシング3aの先端を、底版1aの厚みの途中まで挿入する。例えば、底版1aの鉄筋が配置される部位の手前までケーシング3aの先端を底版1aに挿入する。次に、ケーシング3aの内部に、止水材5を所定量充填する。止水材5が固化したのち、ケーシング3aの内部に第2のケーシング3bを挿入する。ケーシング3bによって、ケーシング3aの内部の止水材5とともに底版1aを貫通させて地中構造物1の下方まで掘削する。例えば、ケーシング3bによって、地下の不透水層まで掘削する。【選択図】図1
CONSTRUCTION METHOD OF FREEZING PIPE
凍結管の施工方法
MATSUMOTO SEIJIRO (author) / KIDA HIROMITSU (author) / TAKAMURA TAKASHI (author) / YOSHIDA TERU (author) / KASHIWAGI TOMOFUMI (author)
2017-07-13
Patent
Electronic Resource
Japanese
Freezing pipe for freezing reinforcement in tunnel construction
European Patent Office | 2023
|Anti-deformation freezing pipe and construction method thereof
European Patent Office | 2022
|