SNOW-MELTING SYSTEM SUCH AS SNOWFALL ROOF
PROBLEM TO BE SOLVED: To provide a snow-melting system capable of coping even with both an installation before snowfall and snow melting after the snowfall.SOLUTION: A branch pipe circulation device 1 is connected in series in the required number, and a water sending pipe 3 is connected to a water sending port 2, and warm water of the constant temperature and constant pressure is flowed by a warm water pump 4. A heat radiation hose 6 cut in the required length is connected to a branch pipe installation port of the branch pipe circulation device 1, and is closed by attaching a closing plug to the tip of the heat radiation hose 6, and a rope installation hole exists in the closing plug, and the heat radiation hose 6 is drawn near by pulling up to the opposite side eaves edge on snowfall or in the snowfall by going over a rooftop by attaching a rope.SELECTED DRAWING: Figure 1
【課題】降雪前の設置も、積雪後の融雪にも、対応できる、融雪装置を提供する。【解決手段】枝管循環装置1を、直列に必要数接続し、送水口2に、送水管3を、接続し、温水ポンプ4により、一定温度、一定圧の温水を流す。枝管循環装置1の枝管取付け口に、必要長さにカットした、放熱ホース6を接続、放熱ホース6の先端に、閉口栓を付けて閉じておき、閉口栓には、ロープ取り付け穴があり、ロープを付け、屋根峯を超え、積雪上又は積雪の中を、放熱ホース6を反対側の軒先まで引き上げ、引きよせる。【選択図】図1
SNOW-MELTING SYSTEM SUCH AS SNOWFALL ROOF
PROBLEM TO BE SOLVED: To provide a snow-melting system capable of coping even with both an installation before snowfall and snow melting after the snowfall.SOLUTION: A branch pipe circulation device 1 is connected in series in the required number, and a water sending pipe 3 is connected to a water sending port 2, and warm water of the constant temperature and constant pressure is flowed by a warm water pump 4. A heat radiation hose 6 cut in the required length is connected to a branch pipe installation port of the branch pipe circulation device 1, and is closed by attaching a closing plug to the tip of the heat radiation hose 6, and a rope installation hole exists in the closing plug, and the heat radiation hose 6 is drawn near by pulling up to the opposite side eaves edge on snowfall or in the snowfall by going over a rooftop by attaching a rope.SELECTED DRAWING: Figure 1
【課題】降雪前の設置も、積雪後の融雪にも、対応できる、融雪装置を提供する。【解決手段】枝管循環装置1を、直列に必要数接続し、送水口2に、送水管3を、接続し、温水ポンプ4により、一定温度、一定圧の温水を流す。枝管循環装置1の枝管取付け口に、必要長さにカットした、放熱ホース6を接続、放熱ホース6の先端に、閉口栓を付けて閉じておき、閉口栓には、ロープ取り付け穴があり、ロープを付け、屋根峯を超え、積雪上又は積雪の中を、放熱ホース6を反対側の軒先まで引き上げ、引きよせる。【選択図】図1
SNOW-MELTING SYSTEM SUCH AS SNOWFALL ROOF
積雪屋根当の、融雪装置。