A platform for research: civil engineering, architecture and urbanism
COLUMN BASE WATERPROOFING METHOD
PROBLEM TO BE SOLVED: To provide a column base waterproofing method with proper workability, which can achieve shortening of a construction period and a reduction in occupied area.SOLUTION: A column base waterproofing method for taking waterproof measures for a column base 3 of a column 2 erected on a waterproof object floor 1 includes: a first step of covering an outer periphery of the column base 3 with a waterproof layer rising part 6 raised from the waterproof object floor 1; a second step of arranging a protection member 7 made of precast concrete, on the outer periphery of the waterproof layer rising part 6 covering the column base 3; and a third step of fixing the protective member 7 arranged on the outer periphery of the waterproof layer rising part 6.SELECTED DRAWING: Figure 3
【課題】施工性が良く、かつ、工期の短縮化と占有面積の縮小化を図ることの可能な柱脚防水工法の提供。【解決手段】防水対象床1に立設された柱2の柱脚3に防水措置を施す柱脚防水工法であって、防水対象床1から立ち上げた防水層立上部6にて柱脚3の外周囲を被覆する第1ステップと、柱脚3を被覆した防水層立上部6の外周囲にプレキャストコンクリート製の保護部材7を配置する第2ステップと、防水層立上部6の外周囲に配置した保護部材7を固定する第3ステップを備える。【選択図】図3
COLUMN BASE WATERPROOFING METHOD
PROBLEM TO BE SOLVED: To provide a column base waterproofing method with proper workability, which can achieve shortening of a construction period and a reduction in occupied area.SOLUTION: A column base waterproofing method for taking waterproof measures for a column base 3 of a column 2 erected on a waterproof object floor 1 includes: a first step of covering an outer periphery of the column base 3 with a waterproof layer rising part 6 raised from the waterproof object floor 1; a second step of arranging a protection member 7 made of precast concrete, on the outer periphery of the waterproof layer rising part 6 covering the column base 3; and a third step of fixing the protective member 7 arranged on the outer periphery of the waterproof layer rising part 6.SELECTED DRAWING: Figure 3
【課題】施工性が良く、かつ、工期の短縮化と占有面積の縮小化を図ることの可能な柱脚防水工法の提供。【解決手段】防水対象床1に立設された柱2の柱脚3に防水措置を施す柱脚防水工法であって、防水対象床1から立ち上げた防水層立上部6にて柱脚3の外周囲を被覆する第1ステップと、柱脚3を被覆した防水層立上部6の外周囲にプレキャストコンクリート製の保護部材7を配置する第2ステップと、防水層立上部6の外周囲に配置した保護部材7を固定する第3ステップを備える。【選択図】図3
COLUMN BASE WATERPROOFING METHOD
柱脚防水工法
TAKAKURA TORU (author) / MATSUZUKA HIROFUMI (author) / AKIYAMA KAZUO (author) / KAWABATA MINORU (author)
2017-09-14
Patent
Electronic Resource
Japanese
Online Contents | 1994
WATERPROOFING MODULE WATERPROOFING STRUCTURE AND COMPLEX WATERPROOFING METHOD
European Patent Office | 2022
|COMPLEX WATERPROOFING METHOD USING WATERPROOFING SHEET AND WATERPROOFING MEMBRANE COATING
European Patent Office | 2021
COMPLEX WATERPROOFING METHOD USING WATERPROOFING SHEET AND WATERPROOFING MEMBRANE COATING
European Patent Office | 2019
|