A platform for research: civil engineering, architecture and urbanism
CONNECTION STRUCTURE BETWEEN BUCKET AND CONNECTION CASING, AND EXCAVATED HOLE BACKFILL METHOD
PROBLEM TO BE SOLVED: To provide a connection structure between a bucket and a connection casing, along with an excavated hole backfill method, the bucket being capable of removing residual soil from the excavated hole.SOLUTION: A connection structure comprises a first connection structural body 21 fixed on a bucket 1 and a second connection structural body 31 fixed on a connection casing 10. The bucket includes a peripheral surface part 2 and a bottom surface part 3 provided on an edge side in an axial direction of the peripheral surface part and having an intake port for taking in sediment. The first connection structural body 21 is fixed on the other edge side in the axial direction of the peripheral surface part 2, while the second connection structural body 31 is fixed on an edge side in an axial direction of the connection casing 10. Either the first connection structural body 21 or the second connection structural body 31 is fitted inside the other. On an outer peripheral surface of the either the first or the second connection structural body fitted inside has a protrusion 32 protruding outward fixed at a plurality of locations in a circumferential direction, while an insertion part 22 into which the protrusion 32 is inserted is formed at a location corresponding to the protrusion 32 on the other. A stopper 40 is inserted between the insertion part 22 and the protrusion 32.SELECTED DRAWING: Figure 2
【課題】残留土を掘削穴から取り除くことができるバケットと接続用ケーシングとの接続構造及び掘削穴埋め戻し工法を提供する。【解決手段】バケット1に固定された第1接続構造体21及び接続用ケーシング10に固定された第2接続構造体31で構成され、バケットは、周面部2及び軸方向の一端側に設けられ、土砂を取り込む取り込み口を備えた底面部3を有し、第1接続構造体21は、周面部2の軸方向の他端側に固定され、第2接続構造体31は接続用ケーシング10の軸方向の一端側に固定され、第1接続構造体21及び第2接続構造体31の一方が他方の内部にはめ込まれ、これらの一方の外周面には、外側に突出した突起体32が周方向の複数の位置に固定され、他方には突起体32に対応する位置に、突起体32を挿入させる被挿入部22が形成され、被挿入部22と突起体32との間に挿入されるストッパー40が設けられている。【選択図】図2
CONNECTION STRUCTURE BETWEEN BUCKET AND CONNECTION CASING, AND EXCAVATED HOLE BACKFILL METHOD
PROBLEM TO BE SOLVED: To provide a connection structure between a bucket and a connection casing, along with an excavated hole backfill method, the bucket being capable of removing residual soil from the excavated hole.SOLUTION: A connection structure comprises a first connection structural body 21 fixed on a bucket 1 and a second connection structural body 31 fixed on a connection casing 10. The bucket includes a peripheral surface part 2 and a bottom surface part 3 provided on an edge side in an axial direction of the peripheral surface part and having an intake port for taking in sediment. The first connection structural body 21 is fixed on the other edge side in the axial direction of the peripheral surface part 2, while the second connection structural body 31 is fixed on an edge side in an axial direction of the connection casing 10. Either the first connection structural body 21 or the second connection structural body 31 is fitted inside the other. On an outer peripheral surface of the either the first or the second connection structural body fitted inside has a protrusion 32 protruding outward fixed at a plurality of locations in a circumferential direction, while an insertion part 22 into which the protrusion 32 is inserted is formed at a location corresponding to the protrusion 32 on the other. A stopper 40 is inserted between the insertion part 22 and the protrusion 32.SELECTED DRAWING: Figure 2
【課題】残留土を掘削穴から取り除くことができるバケットと接続用ケーシングとの接続構造及び掘削穴埋め戻し工法を提供する。【解決手段】バケット1に固定された第1接続構造体21及び接続用ケーシング10に固定された第2接続構造体31で構成され、バケットは、周面部2及び軸方向の一端側に設けられ、土砂を取り込む取り込み口を備えた底面部3を有し、第1接続構造体21は、周面部2の軸方向の他端側に固定され、第2接続構造体31は接続用ケーシング10の軸方向の一端側に固定され、第1接続構造体21及び第2接続構造体31の一方が他方の内部にはめ込まれ、これらの一方の外周面には、外側に突出した突起体32が周方向の複数の位置に固定され、他方には突起体32に対応する位置に、突起体32を挿入させる被挿入部22が形成され、被挿入部22と突起体32との間に挿入されるストッパー40が設けられている。【選択図】図2
CONNECTION STRUCTURE BETWEEN BUCKET AND CONNECTION CASING, AND EXCAVATED HOLE BACKFILL METHOD
バケットと接続用ケーシングとの接続構造及び掘削穴埋め戻し工法
SHIMIZU AKIO (author) / TAKAHARA TORU (author)
2017-09-21
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Design of Pre-Excavated Scour Hole Below Flip-Bucket Spillways
British Library Conference Proceedings | 1993
|Bucket-penetrating type tenon-and-mortise connection structure
European Patent Office | 2023
|