A platform for research: civil engineering, architecture and urbanism
INCLINOMETER INSTALLATION RECOVERY MECHANISM AND INCLINOMETER INSTALLATION RECOVERY METHOD
PROBLEM TO BE SOLVED: To easily recover a plurality of stages of inclinometer devices installed on a cutter post.SOLUTION: An inclinometer device 40 is inserted into a pipe part 30, and is connected in the axial direction Z of the pipe part 30, and is provided in a plurality of stages. A stopper 50 of the inclinometer device 40 is changeably installed in an inclinometer in a state of opening to the outside R1 in the radial direction (to the outside in the axially right-angled direction) and a state of closing to the inside R2 in the radial direction. The stopper 50 can regulate the movement in the axial direction Z of the inclinometer device 40 to te pipe part 30. When the inclinometer device 40 is moved to the extraction side (the upper side Z1) to the pipe part 30, the stopper 50 becomes a closed state, and thereby releases regulation of the movement in the axial direction Z of the inclinometer device 40 to the pipe part 30.SELECTED DRAWING: Figure 3
【課題】カッターポストに設置された複数段の傾斜計装置の回収を容易にする。【解決手段】傾斜計装置40は、管部30に挿入され、管部30の軸方向Zに連結され、複数段設けられる。傾斜計装置40のストッパ50は、径方向外側R1(軸直角方向における外側)に開いた状態、および径方向内側R2に閉じた状態に変化可能に傾斜計に取り付けられる。ストッパ50は、管部30に対する傾斜計装置40の軸方向Zへの移動を規制可能である。管部30に対して傾斜計装置40を引抜側(上側Z1)に移動させたとき、ストッパ50は、閉じた状態になることにより、管部30に対する傾斜計装置40の軸方向Zへの移動の規制を解除する。【選択図】図3
INCLINOMETER INSTALLATION RECOVERY MECHANISM AND INCLINOMETER INSTALLATION RECOVERY METHOD
PROBLEM TO BE SOLVED: To easily recover a plurality of stages of inclinometer devices installed on a cutter post.SOLUTION: An inclinometer device 40 is inserted into a pipe part 30, and is connected in the axial direction Z of the pipe part 30, and is provided in a plurality of stages. A stopper 50 of the inclinometer device 40 is changeably installed in an inclinometer in a state of opening to the outside R1 in the radial direction (to the outside in the axially right-angled direction) and a state of closing to the inside R2 in the radial direction. The stopper 50 can regulate the movement in the axial direction Z of the inclinometer device 40 to te pipe part 30. When the inclinometer device 40 is moved to the extraction side (the upper side Z1) to the pipe part 30, the stopper 50 becomes a closed state, and thereby releases regulation of the movement in the axial direction Z of the inclinometer device 40 to the pipe part 30.SELECTED DRAWING: Figure 3
【課題】カッターポストに設置された複数段の傾斜計装置の回収を容易にする。【解決手段】傾斜計装置40は、管部30に挿入され、管部30の軸方向Zに連結され、複数段設けられる。傾斜計装置40のストッパ50は、径方向外側R1(軸直角方向における外側)に開いた状態、および径方向内側R2に閉じた状態に変化可能に傾斜計に取り付けられる。ストッパ50は、管部30に対する傾斜計装置40の軸方向Zへの移動を規制可能である。管部30に対して傾斜計装置40を引抜側(上側Z1)に移動させたとき、ストッパ50は、閉じた状態になることにより、管部30に対する傾斜計装置40の軸方向Zへの移動の規制を解除する。【選択図】図3
INCLINOMETER INSTALLATION RECOVERY MECHANISM AND INCLINOMETER INSTALLATION RECOVERY METHOD
傾斜計設置回収機構、および傾斜計設置回収方法
KUSAKABE KEISUKE (author) / TSUJIMOTO KEISUKE (author) / MIZUTANI MOTOHIKO (author)
2017-09-21
Patent
Electronic Resource
Japanese
Segmented installation method for array type flexible inclinometer
European Patent Office | 2023
|Inclinometer pipe installation structure and construction method thereof
European Patent Office | 2015
|Overcoming buoyancy during Inclinometer casing Installation - Technical note
Online Contents | 2000
Overcoming buoyancy during Inclinometer casing Installation Technical note
British Library Online Contents | 2000