PANEL TRANSPORTATION JIG AND PANEL TRANSPORTATION METHOD
PROBLEM TO BE SOLVED: To provide a panel transport jig and a panel transport method that resist a load temporarily exerted during transport.SOLUTION: Transport jigs 20, 20 are for a floor panel 1 having floor plates 11, 11, 11A bonded on top surfaces of floor beams 12A, 12, ..., 12B disposed leaving an interval from and almost parallel to each other. The floor panel has openings 121, 121 formed on both ends of the floor beam, and includes a transport beam 2 spanned at both ends of the floor beam in a direction orthogonal to an axis of the floor beam, and support metal fittings 3, ... fitted on a side surface part 21 of the transport beam and inserted into the openings of the plurality of floor beams. Here, each end of the transport beam is connected to the end of the floor beam, through a fixing metal fitting 4 and a cover plate part 5.SELECTED DRAWING: Figure 1
【課題】輸送時に一時的に作用する荷重に対抗可能なパネルの輸送治具及びパネルの輸送方法を提供する。【解決手段】略平行に間隔を置いて配置される床小梁12A,12,・・・,12Bの上面に床板11,11,11Aが張り付けられた床パネル1の輸送治具20,20である。この床パネルは、床小梁の両端が開口121,121された構成となっている。そして、床小梁の両端において床小梁の軸直交方向に差し渡される輸送梁2と、輸送梁の側面部21に取り付けられて複数の床小梁の開口に挿し込まれる支持金具3,・・・とを備えている。ここで、輸送梁の端部は、固定金具4及び蓋板部5を介して床小梁の端部にそれぞれ接合される。【選択図】図1
PANEL TRANSPORTATION JIG AND PANEL TRANSPORTATION METHOD
PROBLEM TO BE SOLVED: To provide a panel transport jig and a panel transport method that resist a load temporarily exerted during transport.SOLUTION: Transport jigs 20, 20 are for a floor panel 1 having floor plates 11, 11, 11A bonded on top surfaces of floor beams 12A, 12, ..., 12B disposed leaving an interval from and almost parallel to each other. The floor panel has openings 121, 121 formed on both ends of the floor beam, and includes a transport beam 2 spanned at both ends of the floor beam in a direction orthogonal to an axis of the floor beam, and support metal fittings 3, ... fitted on a side surface part 21 of the transport beam and inserted into the openings of the plurality of floor beams. Here, each end of the transport beam is connected to the end of the floor beam, through a fixing metal fitting 4 and a cover plate part 5.SELECTED DRAWING: Figure 1
【課題】輸送時に一時的に作用する荷重に対抗可能なパネルの輸送治具及びパネルの輸送方法を提供する。【解決手段】略平行に間隔を置いて配置される床小梁12A,12,・・・,12Bの上面に床板11,11,11Aが張り付けられた床パネル1の輸送治具20,20である。この床パネルは、床小梁の両端が開口121,121された構成となっている。そして、床小梁の両端において床小梁の軸直交方向に差し渡される輸送梁2と、輸送梁の側面部21に取り付けられて複数の床小梁の開口に挿し込まれる支持金具3,・・・とを備えている。ここで、輸送梁の端部は、固定金具4及び蓋板部5を介して床小梁の端部にそれぞれ接合される。【選択図】図1
PANEL TRANSPORTATION JIG AND PANEL TRANSPORTATION METHOD
パネルの輸送治具及びパネルの輸送方法
HOTTA MASANORI (author) / ITO FUMITAKA (author)
2018-01-18
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
PANEL TRANSPORTATION METHOD AND PANEL TRANSPORTATION SYSTEM
European Patent Office | 2022
|European Patent Office | 2016
|Energy-saving integrated wall panel transportation device
European Patent Office | 2020
|