PRECAST WALL STRUCTURE
PROBLEM TO BE SOLVED: To save the trouble in joining work of a precast wall member to a lower structure member and a beam according to the present invention.SOLUTION: A precast wall structure comprises: a beam 30; a middle-stage precast wall member 42M opposed to a side face 30A of the beam 30; a coupling wire material projecting from the middle-stage precast wall member 42M and inserted into a cut part formed in the beam 30; a cement-based filler charged in the cut part to join together the beam 30 and the middle-stage precast wall member 42M; a lower-stage precast wall member 42L arranged below the middle-stage precast wall member 42M; a coupling wire material 50L projecting from the lower-stage precast wall member 42L and inserted into a cut part 52M formed in the middle-stage precast wall member 42M; and a cement-based filler 56 charged in the cut part 52M to join together the middle-stage precast wall member 42M and lower-stage precast wall member 42L.SELECTED DRAWING: Figure 3
【課題】本発明は、下側構造部材及び梁に対するプレキャスト壁部材の接合作業の手間を軽減することを目的とする。【解決手段】プレキャスト壁構造は、梁30と、梁30の側面30Aと対向する中段プレキャスト壁部材42Mと、中段プレキャスト壁部材42Mから突出し、梁30に形成された切欠き部に挿入される連結線材と、切欠き部に充填され、梁30と中段プレキャスト壁部材42Mとを接合するセメント系充填材と、中段プレキャスト壁部材42Mの下に配置される下段プレキャスト壁部材42Lと、下段プレキャスト壁部材42Lから突出し、中段プレキャスト壁部材42Mに形成された切欠き部52Mに挿入される連結線材50Lと、切欠き部52Mに充填され、中段プレキャスト壁部材42Mと下段プレキャスト壁部材42Lとを接合するセメント系充填材56と、を備える。【選択図】図3
PRECAST WALL STRUCTURE
PROBLEM TO BE SOLVED: To save the trouble in joining work of a precast wall member to a lower structure member and a beam according to the present invention.SOLUTION: A precast wall structure comprises: a beam 30; a middle-stage precast wall member 42M opposed to a side face 30A of the beam 30; a coupling wire material projecting from the middle-stage precast wall member 42M and inserted into a cut part formed in the beam 30; a cement-based filler charged in the cut part to join together the beam 30 and the middle-stage precast wall member 42M; a lower-stage precast wall member 42L arranged below the middle-stage precast wall member 42M; a coupling wire material 50L projecting from the lower-stage precast wall member 42L and inserted into a cut part 52M formed in the middle-stage precast wall member 42M; and a cement-based filler 56 charged in the cut part 52M to join together the middle-stage precast wall member 42M and lower-stage precast wall member 42L.SELECTED DRAWING: Figure 3
【課題】本発明は、下側構造部材及び梁に対するプレキャスト壁部材の接合作業の手間を軽減することを目的とする。【解決手段】プレキャスト壁構造は、梁30と、梁30の側面30Aと対向する中段プレキャスト壁部材42Mと、中段プレキャスト壁部材42Mから突出し、梁30に形成された切欠き部に挿入される連結線材と、切欠き部に充填され、梁30と中段プレキャスト壁部材42Mとを接合するセメント系充填材と、中段プレキャスト壁部材42Mの下に配置される下段プレキャスト壁部材42Lと、下段プレキャスト壁部材42Lから突出し、中段プレキャスト壁部材42Mに形成された切欠き部52Mに挿入される連結線材50Lと、切欠き部52Mに充填され、中段プレキャスト壁部材42Mと下段プレキャスト壁部材42Lとを接合するセメント系充填材56と、を備える。【選択図】図3
PRECAST WALL STRUCTURE
プレキャスト壁構造
INOUE TOMITA (author) / KIKUOKA YOJIRO (author) / FUKUHARA TAKESHI (author)
2018-02-15
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PRECAST WALL RAILING, AND JOINT STRUCTURE OF PRECAST WALL RAILING
European Patent Office | 2024
|PRECAST WALL RAILING, AND JOINT STRUCTURE OF PRECAST WALL RAILING
European Patent Office | 2024
|