CONCRETE SKELETON CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To efficiently construct a wall-shaped or columnar concrete skeleton.SOLUTION: A concrete skeleton is constructed by dividing a concrete skeleton to be constructed into multiple lots in vertical direction, disposing a formwork for every lot in order from top to bottom and installing concrete. The construction method comprises: a first process to dispose concrete installation sheath pipes 81, 82 and vibrator sheath pipes 91, 92 in a space surrounded by an inner surface of a first lot construction formwork 50, 50'; a second process to construct first lots 31, 41 by installing concrete in the space surrounded by the inner surface of the first lot construction formwork 50, 50'; and a third process to remove the first lot construction formwork 50, 50'. Sheath pipes 81, 82, 91, 92 are communicated with spaces above the first lots 31, 41 and below the first lots 31, 41.SELECTED DRAWING: Figure 4
【課題】壁状又は柱状のコンクリート躯体を効率良く構築する。【解決手段】構築予定のコンクリート躯体を上下方向に複数のロットに分け、上から下に向かって順番にロットごとに型枠を盛り替えてコンクリートを打設することにより、コンクリート躯体を構築する方法は、コンクリート打設用シース管81,82及びバイブレータ用シース管91,92を、第1ロット構築用型枠50,50’の内面によって囲まれる空間内に配置する第1工程と、第1ロット構築用型枠50,50’の内面によって囲まれる空間内にコンクリートを打設することにより第1ロット31,41を構築する第2工程と、第1ロット構築用型枠50,50’を撤去する第3工程とを含む。シース管81,82,91,92は、第1ロット31,41の上方と第1ロット31,41の下方とを連通する。【選択図】図4
CONCRETE SKELETON CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To efficiently construct a wall-shaped or columnar concrete skeleton.SOLUTION: A concrete skeleton is constructed by dividing a concrete skeleton to be constructed into multiple lots in vertical direction, disposing a formwork for every lot in order from top to bottom and installing concrete. The construction method comprises: a first process to dispose concrete installation sheath pipes 81, 82 and vibrator sheath pipes 91, 92 in a space surrounded by an inner surface of a first lot construction formwork 50, 50'; a second process to construct first lots 31, 41 by installing concrete in the space surrounded by the inner surface of the first lot construction formwork 50, 50'; and a third process to remove the first lot construction formwork 50, 50'. Sheath pipes 81, 82, 91, 92 are communicated with spaces above the first lots 31, 41 and below the first lots 31, 41.SELECTED DRAWING: Figure 4
【課題】壁状又は柱状のコンクリート躯体を効率良く構築する。【解決手段】構築予定のコンクリート躯体を上下方向に複数のロットに分け、上から下に向かって順番にロットごとに型枠を盛り替えてコンクリートを打設することにより、コンクリート躯体を構築する方法は、コンクリート打設用シース管81,82及びバイブレータ用シース管91,92を、第1ロット構築用型枠50,50’の内面によって囲まれる空間内に配置する第1工程と、第1ロット構築用型枠50,50’の内面によって囲まれる空間内にコンクリートを打設することにより第1ロット31,41を構築する第2工程と、第1ロット構築用型枠50,50’を撤去する第3工程とを含む。シース管81,82,91,92は、第1ロット31,41の上方と第1ロット31,41の下方とを連通する。【選択図】図4
CONCRETE SKELETON CONSTRUCTION METHOD
コンクリート躯体の構築方法
YASUNAGA MASAMICHI (author)
2018-03-15
Patent
Electronic Resource
Japanese
European Patent Office | 2019
|CONSTRUCTION METHOD FOR CONCRETE SKELETON AND UNDERGROUND STRUCTURE
European Patent Office | 2021
|RECONSTRUCTION METHOD OF CONCRETE CONSTRUCTION WITH UNDERGROUND SKELETON
European Patent Office | 2018
|