WATER CUT-OFF METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER REPAIR/REINFORCEMENT WORK
PROBLEM TO BE SOLVED: To provide a water cut-off method for a cofferdam structure used in bridge pier repair/reinforcement work that readily realizes a complete water cut-off state that prevents water infiltration into the cofferdam structure.SOLUTION: A cofferdam structure 2 is constructed to surround an outer periphery of a bridge pier 1, the cofferdam structure having a through-hole part 3, through which the bridge pier 1 penetrates and is disposed, formed at a bottom part at a non-submerged location in an upper part of the bridge pier 1. The cofferdam structure 2 is submerged underwater below the bridge and a gap 4 between the through-hole part 3 and the bridge pier 1 is closed with concrete leakage prevention means 5. Then, concrete 6 is filled in the gap 4, and the gap 4 is sealed and water is cut-off as the concrete 6 hardens.SELECTED DRAWING: Figure 1
【課題】仮締切り構造体内に水が浸入しない完全な止水状態を簡易に実現できる橋脚補修・補強工事に用いる仮締切り構造体の止水工法を提供すること。【解決手段】橋脚1の上方の非水没箇所で、底部に橋脚1を貫通配設する貫通孔部3が設けられ橋脚1の外周を囲むように設置される仮締切り構造体2を構築し、この仮締切り構造体2を橋下の水中に降下させ、前記貫通孔部3と前記橋脚1との間の間隙部4をコンクリート漏止手段5で塞いでからこの間隙部4にコンクリート6を充填し、このコンクリート6の硬化により前記間隙部4を密閉して止水する。【選択図】図1
WATER CUT-OFF METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER REPAIR/REINFORCEMENT WORK
PROBLEM TO BE SOLVED: To provide a water cut-off method for a cofferdam structure used in bridge pier repair/reinforcement work that readily realizes a complete water cut-off state that prevents water infiltration into the cofferdam structure.SOLUTION: A cofferdam structure 2 is constructed to surround an outer periphery of a bridge pier 1, the cofferdam structure having a through-hole part 3, through which the bridge pier 1 penetrates and is disposed, formed at a bottom part at a non-submerged location in an upper part of the bridge pier 1. The cofferdam structure 2 is submerged underwater below the bridge and a gap 4 between the through-hole part 3 and the bridge pier 1 is closed with concrete leakage prevention means 5. Then, concrete 6 is filled in the gap 4, and the gap 4 is sealed and water is cut-off as the concrete 6 hardens.SELECTED DRAWING: Figure 1
【課題】仮締切り構造体内に水が浸入しない完全な止水状態を簡易に実現できる橋脚補修・補強工事に用いる仮締切り構造体の止水工法を提供すること。【解決手段】橋脚1の上方の非水没箇所で、底部に橋脚1を貫通配設する貫通孔部3が設けられ橋脚1の外周を囲むように設置される仮締切り構造体2を構築し、この仮締切り構造体2を橋下の水中に降下させ、前記貫通孔部3と前記橋脚1との間の間隙部4をコンクリート漏止手段5で塞いでからこの間隙部4にコンクリート6を充填し、このコンクリート6の硬化により前記間隙部4を密閉して止水する。【選択図】図1
WATER CUT-OFF METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER REPAIR/REINFORCEMENT WORK
橋脚補修・補強工事に用いる仮締切り構造体の止水工法
SATO YUUKI (author) / KASUGA HIDEFUMI (author) / MURAKAMI KOJI (author) / MARUYAMA TETSUO (author)
2018-04-12
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
WATER CUT-OFF METHOD OF COFFERDAM STRUCTURE USED WITH BRIDGE PIER REPAIR/REINFORCEMENT WORK
European Patent Office | 2018
|COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCEMENT WORK
European Patent Office | 2020
|INSTALLATION METHOD FOR COFFERDAM STRUCTURE USED FOR BRIDGE PIER REPAIR AND STRENGTHENING WORK
European Patent Office | 2020
|European Patent Office | 2018
|GUIDE DEVICE FOR UNDERWATER DESCENDING OF COFFERDAM STRUCTURE USED IN PIER REPAIR/REINFORCEMENT WORK
European Patent Office | 2020
|