INSTALLATION METHOD FOR COFFERDAM STRUCTURE TO BE USED FOR BRIDGE PIER MAINTENANCE/REINFORCEMENT WORK
PROBLEM TO BE SOLVED: To provide an installation method for a cofferdam structure to be used for bridge pier maintenance/reinforcement work by which the cofferdam structure can be easily constructed on the water and work for moving the cofferdam structure downwards into the water may also be easily performed.SOLUTION: A suspension scaffold 2 is installed in a non-submergence location at an upper side of a bridge pier 1 and on the suspension scaffold 2, a cofferdam structure 3 is constructed. In a bottom part of the cofferdam structure, a through-hole part 4 that is disposed while penetrating the bridge pier 1 is provided and the cofferdam structure is installed so as to enclose an outer periphery of the bridge pier 1. In the bridge pier 1 and the cofferdam structure 3, fall guides 5 are installed and via the fall guides 5, and the cofferdam structure 3 is moved downwards into the water under a bridge in relative to the bridge pier 1. A clearance between the through-hole part 4 in the bottom part of the cofferdam structure 3 and the outer periphery of the bridge pier 1 is cut off by cutoff means 6. After the cutoff is completed, water 7 in the cofferdam structure 3 is drained and the inside of the cofferdam structure 3 is made into a dry area for work.SELECTED DRAWING: Figure 2
【課題】仮締切り構造体を水上で容易に構築でき、仮締切り構造体の水中への降下作業も容易に行われる橋脚補修・補強工事に用いる仮締切り構造体の設置工法を提供すること。【解決手段】橋脚1の上方の非水没箇所に吊り足場2を設置し、この吊り足場2に、底部に橋脚1を貫通配設する貫通孔部4が設けられ橋脚1の外周を囲むように設置される仮締切り構造体3を構築し、橋脚1と仮締切り構造体3とに降下用ガイド5を設置し、この降下用ガイド5を介して橋脚1に対し仮締切り構造体3を橋下の水中に降下させ、この仮締切り構造体3底部の前記貫通孔部4と前記橋脚1の外周との間の隙間を止水手段6で止水し、止水完了後に仮締切り構造体3内に入り込んでいる水7を排水して、仮締切り構造体3内を作業用ドライエリアとする。【選択図】図2
INSTALLATION METHOD FOR COFFERDAM STRUCTURE TO BE USED FOR BRIDGE PIER MAINTENANCE/REINFORCEMENT WORK
PROBLEM TO BE SOLVED: To provide an installation method for a cofferdam structure to be used for bridge pier maintenance/reinforcement work by which the cofferdam structure can be easily constructed on the water and work for moving the cofferdam structure downwards into the water may also be easily performed.SOLUTION: A suspension scaffold 2 is installed in a non-submergence location at an upper side of a bridge pier 1 and on the suspension scaffold 2, a cofferdam structure 3 is constructed. In a bottom part of the cofferdam structure, a through-hole part 4 that is disposed while penetrating the bridge pier 1 is provided and the cofferdam structure is installed so as to enclose an outer periphery of the bridge pier 1. In the bridge pier 1 and the cofferdam structure 3, fall guides 5 are installed and via the fall guides 5, and the cofferdam structure 3 is moved downwards into the water under a bridge in relative to the bridge pier 1. A clearance between the through-hole part 4 in the bottom part of the cofferdam structure 3 and the outer periphery of the bridge pier 1 is cut off by cutoff means 6. After the cutoff is completed, water 7 in the cofferdam structure 3 is drained and the inside of the cofferdam structure 3 is made into a dry area for work.SELECTED DRAWING: Figure 2
【課題】仮締切り構造体を水上で容易に構築でき、仮締切り構造体の水中への降下作業も容易に行われる橋脚補修・補強工事に用いる仮締切り構造体の設置工法を提供すること。【解決手段】橋脚1の上方の非水没箇所に吊り足場2を設置し、この吊り足場2に、底部に橋脚1を貫通配設する貫通孔部4が設けられ橋脚1の外周を囲むように設置される仮締切り構造体3を構築し、橋脚1と仮締切り構造体3とに降下用ガイド5を設置し、この降下用ガイド5を介して橋脚1に対し仮締切り構造体3を橋下の水中に降下させ、この仮締切り構造体3底部の前記貫通孔部4と前記橋脚1の外周との間の隙間を止水手段6で止水し、止水完了後に仮締切り構造体3内に入り込んでいる水7を排水して、仮締切り構造体3内を作業用ドライエリアとする。【選択図】図2
INSTALLATION METHOD FOR COFFERDAM STRUCTURE TO BE USED FOR BRIDGE PIER MAINTENANCE/REINFORCEMENT WORK
橋脚補修・補強工事に用いる仮締切り構造体の設置工法
SATO YUUKI (author) / KASUGA HIDEFUMI (author) / MURAKAMI KOJI (author)
2018-02-15
Patent
Electronic Resource
Japanese
COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCEMENT WORK
European Patent Office | 2020
|INSTALLATION METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER MAINTENANCE AND STRENGTHENING WORKS
European Patent Office | 2019
|INSTALLATION METHOD FOR COFFERDAM STRUCTURE USED FOR BRIDGE PIER REPAIR AND STRENGTHENING WORK
European Patent Office | 2020
|WATER CUT-OFF METHOD OF COFFERDAM STRUCTURE USED WITH BRIDGE PIER REPAIR/REINFORCEMENT WORK
European Patent Office | 2018
|WATER CUT-OFF METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER REPAIR/REINFORCEMENT WORK
European Patent Office | 2018
|