FILLING STATE MEASURING METHOD OF STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD OF STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of a steel plate concrete structure capable of highly accurately grasping an area of a recessed part formed on a concrete upper surface, while alleviating working labor.SOLUTION: A construction method of a steel plate concrete structure is a construction method of a base isolation foundation 1. The construction method of a steel plate concrete structure includes: steps S1-S8 of constructing a specimen 40 of a steel plate concrete structure by mixing predetermined concrete or a grout material, and acquiring a filling rate of the specimen 40; and steps S9, S10 of, in the case where the acquired filling rate exceeds a predetermined threshold value, performing actual construction of the base isolation foundation 1 by mixing the concrete or the grout material used for the specimen 40.SELECTED DRAWING: Figure 2
【課題】作業手間を軽減しつつ、コンクリート上面に形成された凹部の面積を高精度で把握できる、鋼板コンクリート構造体の構築方法を提供すること。【解決手段】鋼板コンクリート構造体の構築方法は、免震基礎1の構築方法である。鋼板コンクリート構造体の構築方法は、所定のコンクリートまたはグラウト材の調合で、鋼板コンクリート構造体の試験体40を構築し、この試験体40の充填率を求めるステップS1〜S8と、この得られた充填率が所定の閾値を超える場合には、試験体40に用いたコンクリートまたはグラウト材の調合で、免震基礎1を実施工するステップS9、S10と、を含む。【選択図】図2
FILLING STATE MEASURING METHOD OF STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD OF STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of a steel plate concrete structure capable of highly accurately grasping an area of a recessed part formed on a concrete upper surface, while alleviating working labor.SOLUTION: A construction method of a steel plate concrete structure is a construction method of a base isolation foundation 1. The construction method of a steel plate concrete structure includes: steps S1-S8 of constructing a specimen 40 of a steel plate concrete structure by mixing predetermined concrete or a grout material, and acquiring a filling rate of the specimen 40; and steps S9, S10 of, in the case where the acquired filling rate exceeds a predetermined threshold value, performing actual construction of the base isolation foundation 1 by mixing the concrete or the grout material used for the specimen 40.SELECTED DRAWING: Figure 2
【課題】作業手間を軽減しつつ、コンクリート上面に形成された凹部の面積を高精度で把握できる、鋼板コンクリート構造体の構築方法を提供すること。【解決手段】鋼板コンクリート構造体の構築方法は、免震基礎1の構築方法である。鋼板コンクリート構造体の構築方法は、所定のコンクリートまたはグラウト材の調合で、鋼板コンクリート構造体の試験体40を構築し、この試験体40の充填率を求めるステップS1〜S8と、この得られた充填率が所定の閾値を超える場合には、試験体40に用いたコンクリートまたはグラウト材の調合で、免震基礎1を実施工するステップS9、S10と、を含む。【選択図】図2
FILLING STATE MEASURING METHOD OF STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD OF STEEL PLATE CONCRETE STRUCTURE
鋼板コンクリート構造体の充填状況測定方法および鋼板コンクリート構造体の構築方法
TERAUCHI RIEKO (author) / NAMIKI SATORU (author) / OTA TAKASHI (author)
2018-05-10
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD FOR STEEL PLATE CONCRETE STRUCTURE
European Patent Office | 2018
|steel plate concrete structure construction method of steel plate concrete structure using the same
European Patent Office | 2017
|Construction method of steel plate-concrete composite structure
European Patent Office | 2021
|