A platform for research: civil engineering, architecture and urbanism
CONCRETE MEMBER JUNCTION STRUCTURE AND CONCRETE MEMBER JOINING METHOD
PROBLEM TO BE SOLVED: To provide a concrete member junction structure and a concrete member joining method that are capable of easily removing one of two joined concrete members and quickly joining a new concrete member.SOLUTION: A first concrete member 1 and a second concrete member 2 brought into contact with the first concrete member to be joined are joined by a connection member 3 that resists a tensile force. One end of the connection member is buried in an anchor block 4 to resist pulling. The other end of the connection member is inserted into a first through-hole 1a provided to the first concrete member, and inserted into a second through-hole 2a formed through the second concrete member, and the anchor block is locked to the first concrete member. The second through-hole is filled with a filler 5, and the connection member is buried in the second concrete member through hardening, and resists pulling from the second concrete member.SELECTED DRAWING: Figure 1
【課題】接合された2つのコンクリート部材の一方を容易に撤去し、迅速に新たなコンクリート部材を接合することができるコンクリート部材の接合構造及びコンクリート部材の接合方法を提供する。【解決手段】第1のコンクリート部材1と、第1のコンクリート部材に当接して接合される第2のコンクリート部材2と、を引張力に抵抗する連結部材3によって接合する。連結部材の一方の端部はアンカーブロック4に引き抜きに抵抗するように埋め込まれている。連結部材の他端は、第1のコンクリート部材に設けられた第1の貫通孔1aに挿通され、貫通して第2のコンクリート部材に形成された第2の貫通孔2aに挿入されるとともに、アンカーブロックが第1のコンクリート部材に係止される。第2の貫通孔内には充填材5が充填され、硬化することによって連結部材が第2のコンクリート部材に埋め込まれ、第2のコンクリート部材からの引き抜きに抵抗する。【選択図】図1
CONCRETE MEMBER JUNCTION STRUCTURE AND CONCRETE MEMBER JOINING METHOD
PROBLEM TO BE SOLVED: To provide a concrete member junction structure and a concrete member joining method that are capable of easily removing one of two joined concrete members and quickly joining a new concrete member.SOLUTION: A first concrete member 1 and a second concrete member 2 brought into contact with the first concrete member to be joined are joined by a connection member 3 that resists a tensile force. One end of the connection member is buried in an anchor block 4 to resist pulling. The other end of the connection member is inserted into a first through-hole 1a provided to the first concrete member, and inserted into a second through-hole 2a formed through the second concrete member, and the anchor block is locked to the first concrete member. The second through-hole is filled with a filler 5, and the connection member is buried in the second concrete member through hardening, and resists pulling from the second concrete member.SELECTED DRAWING: Figure 1
【課題】接合された2つのコンクリート部材の一方を容易に撤去し、迅速に新たなコンクリート部材を接合することができるコンクリート部材の接合構造及びコンクリート部材の接合方法を提供する。【解決手段】第1のコンクリート部材1と、第1のコンクリート部材に当接して接合される第2のコンクリート部材2と、を引張力に抵抗する連結部材3によって接合する。連結部材の一方の端部はアンカーブロック4に引き抜きに抵抗するように埋め込まれている。連結部材の他端は、第1のコンクリート部材に設けられた第1の貫通孔1aに挿通され、貫通して第2のコンクリート部材に形成された第2の貫通孔2aに挿入されるとともに、アンカーブロックが第1のコンクリート部材に係止される。第2の貫通孔内には充填材5が充填され、硬化することによって連結部材が第2のコンクリート部材に埋め込まれ、第2のコンクリート部材からの引き抜きに抵抗する。【選択図】図1
CONCRETE MEMBER JUNCTION STRUCTURE AND CONCRETE MEMBER JOINING METHOD
コンクリート部材の接合構造及びコンクリート部材の接合方法
KONDO SHINICHI (author)
2018-05-10
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONCRETE MEMBER, CONCRETE MEMBER JOINT STRUCTURE, AND CONCRETE MEMBER JOINING METHOD
European Patent Office | 2022
|European Patent Office | 2022
|CONCRETE MEMBER JOINT AND CONCRETE MEMBER JOINING METHOD
European Patent Office | 2021
|CONCRETE STRUCTURE JOINING METHOD AND PRECAST CONCRETE MEMBER JOINING METHOD
European Patent Office | 2019
|MEMBER JOINING METHOD AND MEMBER JOINING STRUCTURE FOR PRECAST CONCRETE STRUCTURE
European Patent Office | 2023
|