MOBILE WORKING VEHICLE
PROBLEM TO BE SOLVED: To provide a mobile working vehicle capable of improving a response to widening and narrowing width of a structure in a reinforcement prefabrication method.SOLUTION: A mobile working vehicle 121 for executing overhanging construction, comprising a wagen frame 130, a mold support part 139 for supporting a mold for concrete casting, a reinforcement prefabrication part 141 arranged closer to the side of overhanging direction than the mold support part 139 to support a reinforcing bar 150, and a scaffold unit 161 hung by the wagen frame 130 supported thereby to be a scaffold for assembling of the reinforcement 150 at the reinforcement prefabrication part 141. Thanks to a scaffold moving mechanism, the scaffold unit 161 is hung while being movable in the horizontal direction, and thanks to a scaffold fixing mechanism, the scaffold unit 161 is fixed at any position to avoid moving in the horizontal direction.SELECTED DRAWING: Figure 2
【課題】鉄筋先組工法における構造物の拡幅及び縮幅への対応を向上することができる移動作業車を提供する。【解決手段】張出施工を行う移動作業車121において、ワーゲンフレーム130と、コンクリート打設の型枠を支持する型枠支持部139と、型枠支持部139よりも張出方向の側に配置され、鉄筋150を支持する鉄筋先組部141と、ワーゲンフレーム130によって吊り下げられ、鉄筋先組部141での鉄筋150の組立のための足場となる足場ユニット161とを備え、足場移動機構により足場ユニット161が水平方向に移動可能なように吊り下げられ、足場固定機構により足場ユニット161が任意の位置で水平方向に移動しないように固定する。【選択図】図2
MOBILE WORKING VEHICLE
PROBLEM TO BE SOLVED: To provide a mobile working vehicle capable of improving a response to widening and narrowing width of a structure in a reinforcement prefabrication method.SOLUTION: A mobile working vehicle 121 for executing overhanging construction, comprising a wagen frame 130, a mold support part 139 for supporting a mold for concrete casting, a reinforcement prefabrication part 141 arranged closer to the side of overhanging direction than the mold support part 139 to support a reinforcing bar 150, and a scaffold unit 161 hung by the wagen frame 130 supported thereby to be a scaffold for assembling of the reinforcement 150 at the reinforcement prefabrication part 141. Thanks to a scaffold moving mechanism, the scaffold unit 161 is hung while being movable in the horizontal direction, and thanks to a scaffold fixing mechanism, the scaffold unit 161 is fixed at any position to avoid moving in the horizontal direction.SELECTED DRAWING: Figure 2
【課題】鉄筋先組工法における構造物の拡幅及び縮幅への対応を向上することができる移動作業車を提供する。【解決手段】張出施工を行う移動作業車121において、ワーゲンフレーム130と、コンクリート打設の型枠を支持する型枠支持部139と、型枠支持部139よりも張出方向の側に配置され、鉄筋150を支持する鉄筋先組部141と、ワーゲンフレーム130によって吊り下げられ、鉄筋先組部141での鉄筋150の組立のための足場となる足場ユニット161とを備え、足場移動機構により足場ユニット161が水平方向に移動可能なように吊り下げられ、足場固定機構により足場ユニット161が任意の位置で水平方向に移動しないように固定する。【選択図】図2
MOBILE WORKING VEHICLE
移動作業車
YAMANAKA OAKI (author) / OMURA KEIJI (author)
2018-07-19
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,