DISMANTLING METHOD OF EXISTING UNDERGROUND FRAMEWORK
PROBLEM TO BE SOLVED: To provide a dismantling method of an existing underground framework capable of shortening the construction period of dismantling work of existing underground frameworks.SOLUTION: A dismantling method of an existing underground framework comprises a step S1 of building a pair of first retaining walls 40X opposed to each other and a pair of second retaining walls 40Y that are provided substantially perpendicular to the first retaining wall 40X and opposed to each other in an existing underground framework 20, a step S2 of dismantling the existing underground framework 20 to the depth of a first stage cutting beam 41, a step S3 of bridging a cutting beam 41Y between the second retaining walls 40Y, a step S4 of dismantling the existing underground framework 20 to a predetermined depth, leaving a remaining framework 50A, wherein a portion of the existing underground framework 20 that is in contact with the first retaining wall 40X inside the first retaining wall 40X is defined as the remaining framework 50A, and a step S5 of bridging a cutting beam 41X between the first retaining walls 40X.SELECTED DRAWING: Figure 2
【課題】既存地下躯体の解体工事の工期を短縮できる既存地下躯体の解体方法を提供すること。【解決手段】既存地下躯体の解体方法は、既存地下躯体20の内部に、互いに対向する一対の第1の山留め壁40Xと、第1の山留め壁40Xに略直交して設けられて互いに対向する一対の第2の山留め壁40Yと、を構築するステップS1と、既存地下躯体20を1段目の切梁41の深さまで解体するステップS2と、第2の山留め壁40Y同士の間に切梁41Yを架設するステップS3と、既存地下躯体20のうち第1の山留め壁40Xの内側でかつ第1の山留め壁40Xに当接する部分を残置躯体50Aとし、残置躯体50Aを残して所定深さまで解体するステップS4と、第1の山留め壁40X同士の間に切梁41Xを架設するステップS5と、を備える。【選択図】図2
DISMANTLING METHOD OF EXISTING UNDERGROUND FRAMEWORK
PROBLEM TO BE SOLVED: To provide a dismantling method of an existing underground framework capable of shortening the construction period of dismantling work of existing underground frameworks.SOLUTION: A dismantling method of an existing underground framework comprises a step S1 of building a pair of first retaining walls 40X opposed to each other and a pair of second retaining walls 40Y that are provided substantially perpendicular to the first retaining wall 40X and opposed to each other in an existing underground framework 20, a step S2 of dismantling the existing underground framework 20 to the depth of a first stage cutting beam 41, a step S3 of bridging a cutting beam 41Y between the second retaining walls 40Y, a step S4 of dismantling the existing underground framework 20 to a predetermined depth, leaving a remaining framework 50A, wherein a portion of the existing underground framework 20 that is in contact with the first retaining wall 40X inside the first retaining wall 40X is defined as the remaining framework 50A, and a step S5 of bridging a cutting beam 41X between the first retaining walls 40X.SELECTED DRAWING: Figure 2
【課題】既存地下躯体の解体工事の工期を短縮できる既存地下躯体の解体方法を提供すること。【解決手段】既存地下躯体の解体方法は、既存地下躯体20の内部に、互いに対向する一対の第1の山留め壁40Xと、第1の山留め壁40Xに略直交して設けられて互いに対向する一対の第2の山留め壁40Yと、を構築するステップS1と、既存地下躯体20を1段目の切梁41の深さまで解体するステップS2と、第2の山留め壁40Y同士の間に切梁41Yを架設するステップS3と、既存地下躯体20のうち第1の山留め壁40Xの内側でかつ第1の山留め壁40Xに当接する部分を残置躯体50Aとし、残置躯体50Aを残して所定深さまで解体するステップS4と、第1の山留め壁40X同士の間に切梁41Xを架設するステップS5と、を備える。【選択図】図2
DISMANTLING METHOD OF EXISTING UNDERGROUND FRAMEWORK
既存地下躯体の解体方法
SUGISAWA TAKANORI (author) / HAYASHI KAZUHIRO (author) / MASE KOHEI (author)
2018-07-26
Patent
Electronic Resource
Japanese
Bottom-up dismantling method using existing building slab