PROBLEM TO BE SOLVED: To provide a slab construction method to construct a beam integral structure for reinforcing a concrete slab.SOLUTION: The slab construction method includes a unit creation step of connecting deck plates 10 with a plurality of reinforcing steel trusses in one direction in the work space on the ground to make a deck plate unit U1, a reinforcing bar connecting step of connecting a plurality of reinforcing bars extending in one direction at both ends of a deck plate forming both side regions of the deck plate unit, a unit installation step of arranging the deck plate unit in a construction space S between PC beams 34a and 34b by lifting means and installing the vicinity of both ends of the deck plate to the vicinity of the beam surfaces of the PC beams, and a beam integral structure constructing step of constructing a beam integral structure which is integrated with the PC beam as well as constructing a concrete slab at the construction space by placing concrete on the upper surface of the deck plate unit and curing the concrete for a prescribed period.SELECTED DRAWING: Figure 9
【課題】コンクリートスラブを補強するための梁一体構造物を構築することができるスラブ施工方法を提供する。【解決手段】スラブ施工方法は、複数の鉄筋トラス付きデッキプレート10を地上の作業スペースにおいて一方向へ連結してデッキプレートユニットU1を作るユニット作成工程と、デッキプレートユニットの両側方域を形成するデッキプレートの両端部に一方向へ延びる複数の補強鉄筋を連結する補強鉄筋連結工程と、デッキプレートユニットを吊り上げ手段によってPC梁34a,34bの間の施工スペースSに配置し、デッキプレートの両端近傍をPC梁の梁面近傍に設置するユニット設置工程と、デッキプレートユニットの上面にコンクリートを打設し、コンクリートを所定期間養生することで、施工スペースにコンクリートスラブを構築するとともに、PC梁と一体になった梁一体構造物を構築する梁一体構造物構築工程とを有する。【選択図】図9
PROBLEM TO BE SOLVED: To provide a slab construction method to construct a beam integral structure for reinforcing a concrete slab.SOLUTION: The slab construction method includes a unit creation step of connecting deck plates 10 with a plurality of reinforcing steel trusses in one direction in the work space on the ground to make a deck plate unit U1, a reinforcing bar connecting step of connecting a plurality of reinforcing bars extending in one direction at both ends of a deck plate forming both side regions of the deck plate unit, a unit installation step of arranging the deck plate unit in a construction space S between PC beams 34a and 34b by lifting means and installing the vicinity of both ends of the deck plate to the vicinity of the beam surfaces of the PC beams, and a beam integral structure constructing step of constructing a beam integral structure which is integrated with the PC beam as well as constructing a concrete slab at the construction space by placing concrete on the upper surface of the deck plate unit and curing the concrete for a prescribed period.SELECTED DRAWING: Figure 9
【課題】コンクリートスラブを補強するための梁一体構造物を構築することができるスラブ施工方法を提供する。【解決手段】スラブ施工方法は、複数の鉄筋トラス付きデッキプレート10を地上の作業スペースにおいて一方向へ連結してデッキプレートユニットU1を作るユニット作成工程と、デッキプレートユニットの両側方域を形成するデッキプレートの両端部に一方向へ延びる複数の補強鉄筋を連結する補強鉄筋連結工程と、デッキプレートユニットを吊り上げ手段によってPC梁34a,34bの間の施工スペースSに配置し、デッキプレートの両端近傍をPC梁の梁面近傍に設置するユニット設置工程と、デッキプレートユニットの上面にコンクリートを打設し、コンクリートを所定期間養生することで、施工スペースにコンクリートスラブを構築するとともに、PC梁と一体になった梁一体構造物を構築する梁一体構造物構築工程とを有する。【選択図】図9
SLAB CONSTRUCTION METHOD
スラブ施工方法
YAGUCHI SHIGERU (author)
2018-08-23
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONCRETE SLAB CONSTRUCTION DEVICE AND CONCRETE SLAB CONSTRUCTION METHOD
European Patent Office | 2018
|